University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 11254
Title: Use of existing infrastructure
Text: "2.3 Use of Existing Infrastructure. Black Hills agrees, except as provided in Article 2.2, and in situations in which Black Hills proposes to drill from a conventional well pad and new facilities for the Fruitland Coal Wells need to be installed, to use existing infrastructure, including but not limited to the use of existing roads, pipeline routes and Well Pads within the existing drilling windows in the Infill Application Area."
Source Publication Name: Memorandum of Understanding Between the Board of County Commissioners of La Plata County, Colorado and Black Hills Exploration and Production, Inc, 2010
Citation Section: Article II: Density and Use of Existing Well Pads and Facilities
Citation Page: 6
Supplemental Documents:  
Usage Type: Required
Timing: • Production / Operation / Maintenance
Oil / Gas Field:  
Surface Ownership: • Federal
• State
• Private
Mineral Ownership: • Federal
• State
• Private
Primary Contact: Victoria Schmitt
La Plata County
1060 E. 2nd Ave.
Durango, Colorado  81301  USA
Phone:     Alt. Phone:
Fax:     E-mail: 
Alternate Contact: Black Hills Exploration and Production, Inc
1515 Wynkoop, Suite 500
Denver, CO  80202  USA
Phone:     Alt. Phone:
Fax:     E-mail: 
Categories: Land Surface Disturbance
Location: Colorado
Species:
Vegetation Types:
• Suburban / urban
General Comments: Local Government - Operator MOU 2.1 Density. "Black Hills agrees that, except as provided in Article 2.2 herein or as may be otherwise permitted in the COGCC order approving Black Hills's Infill Application, the density of FruitlandĀ· Coal Well Pads within the Infill Application Area shall not exceed two (2) within any drilling and spacing units of 320 acres for the Fruitland Coal Seam formation covering lands in La Plata County, Colorado. Notwithstanding the foregoing, nothing contained in this Article II shall be construed so as to require the closure or abandonment of any existing gas well."
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2016-05-27 20:21 UTC
Last Updated: 2016-06-01 16:38 UTC