| BMP ID: |
1316 |
| Title: |
Apply erosion control measures through reclamation |
| Text: |
"Increased sedimentation impacts to surface waters would be avoided or minimized through construction and erosion control practices approved with each authorization and through the prompt reclamation of disturbances." |
| Source Publication Name: |
Jonah Infill Drilling Project Record of Decision |
| Citation Section: |
Appendix B: Operator Committed Practices |
| Citation Page: |
B-6 |
| Supplemental Documents: |
|
| Usage Type: |
Required |
| Timing: |
• Construction / Siting / Design
• Production / Operation / Maintenance
|
| Oil / Gas Field: |
Jonah Infill Drilling Project Area (GREATER GREEN RIVER) |
| Surface Ownership: |
• Federal
|
| Mineral Ownership: |
• Federal
|
| Primary Contact: |
BLM - Pinedale Field Office 1625 West Pine St., PO Box 768 Pinedale, Wyoming 82941 United States |
|
|
| Alternate Contact: |
|
| |
| Categories: |
Water Quality and Pollution
Vegetation
Land Surface Disturbance
|
| Location: |
Wyoming |
| Species: |
|
| Vegetation Types: |
|
| General Comments: |
|
| Cost-Benefit Analysis: |
|
| BMP Efficacy: |
|
| Date Entered: |
2009-02-04 13:40 UTC |
| Last Updated: |
2011-06-07 16:21 UTC |