University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 5625
Title: Allow for freeboard between bottom of bridge girders and expected high water level/floating debris.
Text: "Bridges: Allow for some freeboard, typically at least 0.5 to 1.0 meter, between the bottom of bridge girders and expected high water level and floating debris. Structures in a jungle environment with very high intensity rainfall may need additional freeboard. Alternatively, a bridge may be designed for overtopping, somewhat like a low water ford, and eliminate the need for freeboard, but increase the need for a erosion resistant deck and approach slabs (Photo 10.6)." [See Photo 10.6, page 102.]
Source Publication Name: Low-Volume Roads Engineering: Best Management Practices Field Guide
Citation Section: Chapter 10: Bridges
Citation Page: 100
Supplemental Documents:  
Usage Type: Recommended
Timing: • Construction / Siting / Design
Oil / Gas Field:  
Surface Ownership: • Federal
• State
• Private
Mineral Ownership: • Federal
• State
• Private
Primary Contact:  
 
Alternate Contact:  
 
Categories: Other
Location: General / Federal
Species:
Vegetation Types:
General Comments:
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2009-06-09 14:02 UTC
Last Updated: 2011-01-29 09:58 UTC