BMP ID: |
5663 |
Title: |
Apply erosion control measures before the rainy season begins and after each season of construction |
Text: |
"Erosion Control: Apply erosion control measures before the rainy season begins and after each season of construction, preferably immediately following construction. Install erosion control measures as each road section is completed." |
Source Publication Name: |
Low-Volume Roads Engineering: Best Management Practices Field Guide |
Citation Section: |
Chapter 13: Erosion Control |
Citation Page: |
139 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Construction / Siting / Design
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
|
|
Alternate Contact: |
|
|
Categories: |
Land Surface Disturbance
|
Location: |
General / Federal |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-06-11 17:18 UTC |
Last Updated: |
2009-09-03 11:01 UTC |