BMP ID: |
8977 |
Title: |
Temporary Water Line Regulations |
Text: |
"5. Water Supply and Quality. ... Where feasible, temporary surface water lines are encouraged and will be utilized. Operator may be permitted to utilize County Road Right-of-Way, and County drainage culverts, where practical, for the laying and operation of temporary water lines on the surface and in accordance with Adams County Standards and Regulations. If necessary, Operator will bury temporary water lines at existing driveway and gravel road crossings, or utilize existing culverts, if available, with County approval." |
Source Publication Name: |
Memorandum of Understanding between Adams County and Oil and Gas Operators, 2015 |
Citation Section: |
|
Citation Page: |
3 |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Construction / Siting / Design
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
Adams County Attorney 4430 S. Adams County Pkwy Brighton, Colorado 80601-8206 United States |
Phone: | 720-523-6116 |
|
Alt. Phone: | |
Fax: | 720-523-6114 |
|
E-mail: | |
|
Alternate Contact: |
Adams County Planning and Development Department 4430 S Adams County Pkwy Brighton, CO 80601 United States |
Phone: | 720-523-6800 |
|
Alt. Phone: | |
Fax: | 720-523-6998 |
|
E-mail: | |
|
Categories: |
Land Surface Disturbance
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
• Suburban / urban
|
General Comments: |
Local Government - Operator MOU |
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2015-12-24 12:41 UTC |
Last Updated: |
2016-06-29 14:14 UTC |