University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 8977
Title: Temporary Water Line Regulations
Text: "5. Water Supply and Quality. ... Where feasible, temporary surface water lines are encouraged and will be utilized. Operator may be permitted to utilize County Road Right-of-Way, and County drainage culverts, where practical, for the laying and operation of temporary water lines on the surface and in accordance with Adams County Standards and Regulations. If necessary, Operator will bury temporary water lines at existing driveway and gravel road crossings, or utilize existing culverts, if available, with County approval."
Source Publication Name: Memorandum of Understanding between Adams County and Oil and Gas Operators, 2015
Citation Section:
Citation Page: 3
Supplemental Documents:  
Usage Type: Required
Timing: • Construction / Siting / Design
Oil / Gas Field:  
Surface Ownership: • Federal
• State
• Private
Mineral Ownership: • Federal
• State
• Private
Primary Contact: Adams County Attorney
4430 S. Adams County Pkwy
Brighton, Colorado  80601-8206  United States
Phone:720-523-6116     Alt. Phone:
Fax:720-523-6114     E-mail: 
Alternate Contact: Adams County Planning and Development Department
4430 S Adams County Pkwy
Brighton, CO  80601  United States
Phone:720-523-6800     Alt. Phone:
Fax:720-523-6998     E-mail: 
Categories: Land Surface Disturbance
Location: Colorado
Species:
Vegetation Types:
• Suburban / urban
General Comments: Local Government - Operator MOU
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2015-12-24 12:41 UTC
Last Updated: 2016-06-29 14:14 UTC