University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 9150
Title: Temporary Water Line Regulations
Text: "6. Water Supply and Quality. ... Where feasible, temporary surface water lines are encouraged and will be utilized. Operator may be permitted to utilize County Road Right-of-Way, and County drainage culverts, where practical and in accordance with an executed Elbert County Master Road Use Agreement, for the laying and operation of temporary water lines on the surface. If necessary, Operator will bury temporary water lines at existing driveway and gravel road crossings, or utilize existing culverts, if available."
Source Publication Name: Memorandum of Understanding Between Elbert County and Agave Oil and Gas LLC, 2014
Citation Section:
Citation Page: 2-3
Supplemental Documents:  
Usage Type: Required
Timing: • Construction / Siting / Design
Oil / Gas Field:  
Surface Ownership: • Federal
• State
• Private
Mineral Ownership: • Federal
• State
• Private
Primary Contact: Elbert County Board of County Commissioners
215 Comanche St
Kiowa, CO  80117  United States
Phone:303-621-3126     Alt. Phone:
Fax:     E-mail: 
Alternate Contact: Mr. Richard Henninger
Agave Oil & Gas, LLC
512 Main Street, Ste 600
Fort Worth, Texas  76102
Phone:817-870-0026     Alt. Phone:
Fax:     E-mail: 
Categories: Land Surface Disturbance
Location: Colorado
Species:
Vegetation Types:
• Suburban / urban
General Comments: Local Government - Operator MOU
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2016-01-02 13:45 UTC
Last Updated: 2016-06-27 13:02 UTC