BMP ID: |
9776 |
Title: |
Maximize setbacks |
Text: |
"5. Setbacks for New Wells. . . . In the event that the parties determine that locating a well or oil and gas location outside these distances is not reasonably practicable, the operator shall maximize equipment and wellhead setbacks from Building Units, High Occupancy Building Units, or public water supply wells beyond the setbacks required by the COGCC to the greatest extent reasonably practicable." |
Source Publication Name: |
Brighton Memorandum of Understanding, (Draft Model) |
Citation Section: |
Attachment A |
Citation Page: |
10 |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Construction / Siting / Design
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
City of Brighton, City Manager's Office 500 S. 4th Ave. Brighton, CO 80601 United States |
Phone: | |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
Margaret Brubaker City of Brighton 21 North 1st Avenue, Suite 290 Brighton, CO 80601 United States |
Phone: | |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Categories: |
Water Quality and Pollution
Other
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
• Suburban / urban
|
General Comments: |
Local Government - Operator MOU |
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2016-01-18 19:30 UTC |
Last Updated: |
2016-03-14 21:26 UTC |