BMP ID: |
9824 |
Title: |
Records on file for inspection |
Text: |
"13. Air Quality Mitigations. . . c. The operator must maintain the following records on file for inspection by the City: (a) certification of compliance with these City and state air quality requirements and documenting any periods of non-compliance, including the date and duration of each deviation and a compliance plan and schedule to achieve compliance; and (b) that the equipment at the well site continues to operate within its design parameters, and if not, what steps will be taken to modify the equipment to enable the equipment to operate within its design parameters. The operator may satisfy this obligation in whole or in part by making its AQCC Regulations No. 7 semi-annual reports and annual self-inspection reports available to the City for the prior calendar year." |
Source Publication Name: |
Brighton Memorandum of Understanding, (Draft Model) |
Citation Section: |
Attachment A |
Citation Page: |
12 |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Monitoring
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
City of Brighton, City Manager's Office 500 S. 4th Ave. Brighton, CO 80601 United States |
Phone: | |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
Margaret Brubaker City Attorney 21 North 1st Avenue, Suite 290 Brighton, CO 80601 USA |
Phone: | |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Categories: |
Air Quality and Emissions
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
• Suburban / urban
|
General Comments: |
Local Government - Operator MOU |
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2016-01-25 14:40 UTC |
Last Updated: |
2016-03-14 22:07 UTC |