BMP ID |
Short Title |
Text of BMP |
---|
9388 |
Landowner notification |
"2. Prior to commencement of any new drilling or completion operations, provide notification to landowners within one-half (1/2) mile of the ... |
9387 |
Maximize setbacks |
"1. Maximize equipment and wellhead setbacks from occupied buildings and residences to the extent feasible and practicable, as determined by KMOGO." |
9392 |
Noise, light, and dust mitigation plan |
"3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the Oil and Gas ... |
9394 |
Plan changes and updates |
"3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the Oil and Gas ... |
9391 |
Reclamation plan |
"3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the Oil and Gas ... |
9390 |
Site plan for preparation, mobilization, and demobilization |
"3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the Oil and Gas ... |
9389 |
Summary of planned operations |
"3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the Oil and Gas ... |
9393 |
Traffic management plan |
"3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the Oil and Gas ... |
9396 |
Utilize closed-loop systems |
"5. Utilize closed-loop systems for drilling and completion operations to minimize the need for earthen pits." |
9397 |
Utilize multistage pressure separation in conjunction with a vapor recovery unit |
"6. Utilize multistage pressure separation in conjunction with a vapor recovery unit (VRU) for new wells drilled. KMOGO may remove the VRU system at ... |
9395 |
Utilize steel-rim berms |
"4. Utilize steel-rim berms around tanks and separators instead of sand or soil berms, unless requested otherwise by surface owner or because of ... |