BMP ID |
Short Title |
Text of BMP |
---|
3893 |
A block survery is highly recommended in order to ensure all the Project is covered by a cultural resource inventory |
D. Cultural Resources Plan: "A block survey is highly recommended in order to ensure that all components of a federal CBNG Project area are covered ... |
3844 |
A Drilling Plan may be submitted for one or more wells |
III. Requirements for the Drilling Plan: "A Drilling Plan may be submitted for a single well or as a Master Drilling Plan for several wells within a ... |
3855 |
A Surface Use Plan submitted for one or more wells where construction and reclamation would be the same in Project |
IV. Requirements for the Surface Use Plan: "A Surface Use Plan may be submitted for a single well or as a Master Surface Use Plan for several wells ... |
3894 |
A Wildlife Monitoring Plan (WMP) gives BLM wildlife information, identifies problems, and makes recommendations through form of application |
E. Wildlife Monitoring Plan: "For Project PODs, a Wildlife Monitoring Plan (WMP) will be provided to BLM to acquire existing wildlife information, ... |
6326 |
Access roads should be designed and constructed to accomodate anticipated traffic and weather conditions. |
Access Roads: "Access roads should be designed and constructed to accomodate anticipated traffic and weather conditions." |
6330 |
Access roads should be located on grades less than 8% |
Access Roads: "Access roads should be located on grades less than 8%, where possible." |
6329 |
Access roads should be located on ridge tops and on gentle upland slopes |
Access Roads: "Access roads should be located on ridge tops and on gentle upland slopes where possible." |
6327 |
Access roads should be located out of or away from snow drifting areas. |
Access Roads: "Access roads should be located out of or away from snow drifting areas." |
6325 |
Access roads should be located to provide safe, year-round travel. |
Access Roads: "Access roads should be located to provide safe, year round travel." |
6339 |
All blooie lines must end a minimum of 30' from the wellbore and be securely anchored. The blooie lines must be in a straight line. |
Drilling and Production Related Field Considerations: "All blooie lines must end a minimum of 30' from the wellbore and be securely anchored. The ... |
6340 |
All casing strings will have centralizers on the bottom three joints of the casing. |
Drilling and Production Related Field Considerations: "The minimum requirement for casing centralizers is all casing strings will have centralizers ... |
3889 |
All companies submitting APDs and PODs for CBNG projects must submit a soil survey for the project area |
C. Soil Survery Requirements: "All companies submitting APDs and PODs for CBNG projects must submit a soil survey for the project area. One source ... |
3891 |
All federal CBNG projects must comply with the National Historic Preservation Act |
D. Cultural Resources Plan: "All federal CBNG projects must comply with the National Historic Preservation Act. The BLM has many responsibilities ... |
6338 |
All well control equipment must meet the minimum requirements as set forth in Onshore Order No. 2 unless a waiver is granted by the BLM. |
Drilling and Production Related Field Considerations: "All well control equipment must meet the minimum requirements as set forth in Onshore Order ... |
6344 |
All well locations must be properly identified with a legible sign. |
Drilling and Production Related Field Considerations: "From the time a well pad is constructed or a well is spudded (if no well pad construction), ... |
3870 |
Any ancillary facilities associated with the proposed drilling activities should be described |
IV. Requirements for the Surface Use Plan: "8. Ancillary Facilities-- Describe any ancillary facilities, such as airstrips and camps associated with ... |
3886 |
APDs or Project PODs on split-estate lands will not be approved by Operator, unless abides by following conditions |
11. Surface Ownership: "APDs or Project PODs on split-estate lands will not be approved unless the Operator: a) certifies that a surface owner ... |
6328 |
Avoid access roads in wet areas and in sensitive habitats |
Access Roads: "Access roads should be kept out of lowland bottoms, drainages, wet areas and special status and threatened and endangered species ... |
3857 |
BLM or surface owner may restrict use of temporary roads |
"2. Proposed Access Roads: BLM or the surface owner may restrict the use of two-track roads (BLM Temporary Roads) during inclement weather and spring ... |
3895 |
BLM ROW is required when surface disturbance is proposed off-lease, on BLM surface, or on-lease by someone other than Operator |
F. BLM Right-of-Way: "A BLM right-of-way (ROW) is required when surface disturbance or occupancy is proposed off-lease on BLM surface, or on-lease by ... |