BMP ID: |
4153 |
Title: |
All crossings should consider the failure of the crossing during flows beyond the design capacity |
Text: |
"Developed or Designed Roads: Methods for designing road crossings: All crossings should consider the failure of the crossing during flows beyond the design capacity. This can be accomplished by allowing the road fill to be breached in pre-determined locations during storm events greater than the design capacity, and not diverting the water to a new pathway causing gullying, erosion, and formation of a new channel." |
Source Publication Name: |
Atlantic Rim Natural Gas Field Final Environmental Impact Statement |
Citation Section: |
Appendix J: Best Management Practices for Reducing Non-Point Source Pollution |
Citation Page: |
J-11 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Construction / Siting / Design
• Production / Operation / Maintenance
|
Oil / Gas Field: |
Atlantic Rim Natural Gas Field (GREATER GREEN RIVER) |
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
David Simons BLM - Wyoming State Office 5353 Yellowstone Road Cheyenne, Wyoming 82003 United States |
Phone: | (307) 328-4328 |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
|
|
Categories: |
Land Surface Disturbance
|
Location: |
Wyoming |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-03-13 15:28 UTC |
Last Updated: |
2009-05-01 15:28 UTC |