BMP ID: |
6090 |
Title: |
Avoid construction and operations within or near sensitive areas |
Text: |
Collaborative Plans of Development (POD): Well site design and construction: "As practicable, [avoid] construction and operations within or near sensitive riparian, floodplains, wetlands, springs, seeps and other water features, and areas subject to severe erosion and or mass movement in compliance with all legislation, BLM and other stipulations, and agreements; a hydrological study already mentioned above will identify those sensitive areas to avoid" |
Source Publication Name: |
Watershed Plan for the Town of Palisade and the City of Grand Junction Colorado |
Citation Section: |
Best Management Practices for Risk Mitigation to Protect Watersheds |
Citation Page: |
19 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Construction / Siting / Design
|
Oil / Gas Field: |
Piceance Basin (UINTA-PICEANCE) |
Surface Ownership: |
• Federal
• Private
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
Town of Palisade Public Works Director |
Phone: | 970.464.1116 |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
City of Grand Junction Public Works and Utilities Director |
Phone: | 970.256.4076 |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Categories: |
Land Surface Disturbance
Aquatic and Riparian Values
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-08-12 13:52 UTC |
Last Updated: |
2009-09-16 12:09 UTC |