Use a V-shaped pit |
Text: |
"...use a V-shaped pit instead of the traditional rectangular pit. This type of pit reduces water requirements, as well as the amount of surface disturbance." |
Source Publication Name: |
Oil and Gas Accountability Project, Best Practices |
Citation Section: |
Redesigned pits |
Citation Page: |
1 |
Supplemental Documents: |
See the Source Document for links to supplemental information
|
Usage Type: |
Recommended |
Timing: |
• Drilling
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
Earthworks 1612 K. St., NW, Suite 808 Washington, DC 20006 United States |
|
Alternate Contact: |
|
|
Categories: |
Water Quantity and Rights
Land Surface Disturbance
|
Location: |
General / Federal |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
"A company installed a V-shaped reserve pit and compared the costs with those incurred at similar-sized wells using a traditional pit. The company determined that pit construction time was reduced by about 40 percent, water costs for the well were reduced by about 38 percent, and pit liner costs were reduced by about 43 percent. The total cost savings were about $10,800 per well." (web page at footnote 2) |