A 400-foot well and road buffer must be located 0.5-miles from an active, inactive, or newly discovered eagle and hawk nests. |
FISH AND WILDLIFE: "WFM-3 — A 400-foot well and road construction buffer from slopes greater than 40 percent located within 0.5-mile of an active, ... |
87 |
A buffer strip of vegetation shall be left between areas of surface disturbance and riparian vegetation |
Riparian Areas, Mitigation Measures: "A buffer strip of vegetation, width determined on a case-by-case basis, shall be left between areas of surface ... |
4209 |
A habitat migration plan is required prior to development of tar sands resources. |
"Wildlife, Wildlife Habitat: STSAs: A habitat mitigation plan would be required prior to development of tar sands resources." |
3894 |
A Wildlife Monitoring Plan (WMP) gives BLM wildlife information, identifies problems, and makes recommendations through form of application |
E. Wildlife Monitoring Plan: "For Project PODs, a Wildlife Monitoring Plan (WMP) will be provided to BLM to acquire existing wildlife information, ... |
7838 |
Abide by laws and regulations regarding hunting |
"BBC [Bill Barrett Corporation] will require that their personnel, contractors, and subcontractors abide by all State and Federal laws and ... |
3753 |
Above ground facilities will not be located near active raptor nests |
"Well pads, access roads, and other aboveground facilities will not be located within 825 feet of an active raptor nest, within 1,000 feet of an ... |
1042 |
Aboveground facilities will not be located near raptor nests |
"Well pads, access roads, and other aboveground facilities will not be located within 825 feet of an active raptor nest, within 1,000 feet of an ... |
2267 |
Access roads should be practical and avoid erosion. All vehicles will not travel outside of the original access road boundary |
"e. Surface disturbance minimization. (4) Access roads. Existing roads shall be used to the greatest extent practicable to avoid erosion and minimize ... |
380 |
Accomplish interim reclamation as soon as possible. |
"Accomplish interim rehabilitation and reclamation as soon as practicable after disturbance." |
2119 |
Acknowledge potential conflicts |
"Administrative/Regulatory (BLM): Acknowledge potential conflicts." |
1538 |
Acquire permits from the appropriate federal and state agencies before manipulating or destroying a raptor nest |
"If nest manipulation or a situation requiring a 'taking' of a raptor nest becomes necessary, a special permit will be obtained from the Denver ... |
578 |
Acquire specific approval from the BLM for facility construction in areas requiring repeated human presence. |
"Facility construction in these areas [requiring repeated human presence] would require specific approval from the BLM." |
707 |
Active bald eagle nests within one mile of project related disturbance areas will be monitored between March 1 and mid-July. |
Annual Inventory and Monitoring: Raptors: "Active nests located within one mile of project-related disturbance areas will be monitored between March ... |
175 |
Activities associated with oil and gas exploration and development are restricted to outside the riparian vegetation zone. |
"For the protection of perennial water impoundments and streams, and/or riparian/wetland vegetation zones, activities associated with oil and gas ... |
2383 |
Add mitigation measures if determined as necessary by BLM biologist |
"Additional mitigation measure may be necessary if the site-specific project is determined by a BLM biologist to have adverse effects to black-footed ... |
2378 |
Add mitigation measures if determined as necessary by BLM biologist |
"Additional mitigation measures may be necessary if the site-specific project is determined by a BLM biologist to have adverse effects to bald eagles ... |
9220 |
Additional Requirements for Multi-Well Pit Construction |
"2. Operator's Pit Practices within the County. ... f. Multi-Well Pits: ... Additional requirements, such as fencing, may be required by the County, ... |
8971 |
Additional Requirements for Multi-Well Pits |
"2. Operator's Pit Practices within the County. d. Multi-Well Pits: ... Additional requirements, such as fencing, may be required by the County, pre- ... |
11869 |
Additional Requirements for Multi-Well Pits |
"2. Operator's Pit Practices within the County. d. Multi-Well Pits: ... Additional requirements, such as fencing, may be required by the County, pre- ... |
4798 |
Adequately protect areas containing hydrocarbons |
Wildlife and Fisheries: "Reserve, workover, and evaporation pits and other areas that contain hydrocarbons would be adequately protected to prevent ... |