140 A 400-foot well and road buffer must be located 0.5-miles from an active, inactive, or newly discovered eagle and hawk nests. FISH AND WILDLIFE: "WFM-3 — A 400-foot well and road construction buffer from slopes greater than 40 percent located within 0.5-mile of an active, ...
87 A buffer strip of vegetation shall be left between areas of surface disturbance and riparian vegetation Riparian Areas, Mitigation Measures: "A buffer strip of vegetation, width determined on a case-by-case basis, shall be left between areas of surface ...
4209 A habitat migration plan is required prior to development of tar sands resources. "Wildlife, Wildlife Habitat: STSAs: A habitat mitigation plan would be required prior to development of tar sands resources."
3894 A Wildlife Monitoring Plan (WMP) gives BLM wildlife information, identifies problems, and makes recommendations through form of application E. Wildlife Monitoring Plan: "For Project PODs, a Wildlife Monitoring Plan (WMP) will be provided to BLM to acquire existing wildlife information, ...
7838 Abide by laws and regulations regarding hunting "BBC [Bill Barrett Corporation] will require that their personnel, contractors, and subcontractors abide by all State and Federal laws and ...
3753 Above ground facilities will not be located near active raptor nests "Well pads, access roads, and other aboveground facilities will not be located within 825 feet of an active raptor nest, within 1,000 feet of an ...
1042 Aboveground facilities will not be located near raptor nests "Well pads, access roads, and other aboveground facilities will not be located within 825 feet of an active raptor nest, within 1,000 feet of an ...
2267 Access roads should be practical and avoid erosion. All vehicles will not travel outside of the original access road boundary "e. Surface disturbance minimization. (4) Access roads. Existing roads shall be used to the greatest extent practicable to avoid erosion and minimize ...
380 Accomplish interim reclamation as soon as possible. "Accomplish interim rehabilitation and reclamation as soon as practicable after disturbance."
2119 Acknowledge potential conflicts "Administrative/Regulatory (BLM): Acknowledge potential conflicts."
1538 Acquire permits from the appropriate federal and state agencies before manipulating or destroying a raptor nest "If nest manipulation or a situation requiring a 'taking' of a raptor nest becomes necessary, a special permit will be obtained from the Denver ...
578 Acquire specific approval from the BLM for facility construction in areas requiring repeated human presence. "Facility construction in these areas [requiring repeated human presence] would require specific approval from the BLM."
707 Active bald eagle nests within one mile of project related disturbance areas will be monitored between March 1 and mid-July. Annual Inventory and Monitoring: Raptors: "Active nests located within one mile of project-related disturbance areas will be monitored between March ...
175 Activities associated with oil and gas exploration and development are restricted to outside the riparian vegetation zone. "For the protection of perennial water impoundments and streams, and/or riparian/wetland vegetation zones, activities associated with oil and gas ...
2383 Add mitigation measures if determined as necessary by BLM biologist "Additional mitigation measure may be necessary if the site-specific project is determined by a BLM biologist to have adverse effects to black-footed ...
2378 Add mitigation measures if determined as necessary by BLM biologist "Additional mitigation measures may be necessary if the site-specific project is determined by a BLM biologist to have adverse effects to bald eagles ...
9220 Additional Requirements for Multi-Well Pit Construction "2. Operator's Pit Practices within the County. ... f. Multi-Well Pits: ... Additional requirements, such as fencing, may be required by the County, ...
8971 Additional Requirements for Multi-Well Pits "2. Operator's Pit Practices within the County. d. Multi-Well Pits: ... Additional requirements, such as fencing, may be required by the County, pre- ...
11869 Additional Requirements for Multi-Well Pits "2. Operator's Pit Practices within the County. d. Multi-Well Pits: ... Additional requirements, such as fencing, may be required by the County, pre- ...
4798 Adequately protect areas containing hydrocarbons Wildlife and Fisheries: "Reserve, workover, and evaporation pits and other areas that contain hydrocarbons would be adequately protected to prevent ...