474 50 percent of the pit should be below original ground level Well Sites: Reserve Pits: "If [locating the pit on the drill pad next to the high wall] is not possible, at least 50 percent of the reserve pit ...
507 Accommodate a 10-year flood with culverts Drainage and Drainage Structures: Surface Drainage: "Culverts should accommodate a 10-year flood without development of a static head and avoid ...
6135 Achieve isolation of fresh water zones prior to deepening of the well Well Construction - Cementing/Surface Casing: "If the aforemenioned steps have not been achieved, remedial cement work will be conducted until ...
11873 Acquisition of Appropriate Nearby Water Source "5. Water Supply and Quality. In an effort to reduce truck traffic, where feasible, the Operator will identify a water source lawfully available for ...
8975 Acquisition of Appropriate Nearby Water Source "5. Water Supply and Quality. In an effort to reduce truck traffic, where feasible, the Operator will identify a water source lawfully available for ...
9902 Action plan if carbon isotope test results in a thermogenic or intermediate mix signature "5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature . . . . an action plan shall be ...
10029 Action plan if methane concentration increases "5.2 Water Well Monitoring. . . . If the methane concentration level increases by more than 5 mg/L between sampling periods . . . an action plan ...
10218 Action plan if methane concentration increases "5.2 Water Well Monitoring. . . . If the methane concentration level increases by more than 5 mg/L between sampling periods . . .an action plan shall ...
10331 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
10457 Action plan if methane concentration increases "5.2 Water Well Monitoring. . . . If the methane concentration level increases by more than 5 mg/L between sampling periods, or increases to more ...
10574 Action plan if methane concentration increases "5.2 Water Well Monitoring. ... ​If ​the methane concentration level increases by more than ​5 ​mg/L between sampling periods, or increase to ...
10645 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
10715 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
9630 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
9706 Action plan if methane concentration increases "5.2 Water Well Monitoring. . . .If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
10804 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
10877 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
10949 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
11596 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
11670 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...