BMP ID |
Short Title |
Text of BMP |
---|
950 |
Avoid activities or structures in bald eagles' direct flight path |
"Avoid potentially disruptive activities or permanent above-ground structures in the bald eagles' direct flight path between their nest and roost ... |
947 |
Avoid light disturbance to surrounding areas during night operations |
"During night operations, direct lighting toward the pad to avoid light disturbance to surrounding areas if no negative pad safety impact is ... |
934 |
Build power lines to Avian Power Line Interaction Committee standards |
"Build all power lines to standards identified in Avian Power Line Interaction Committee and utilize industry-accepted standards to prevent raptors ... |
943 |
Complete drilling and all wells prior to moving development activities to another pad |
"The areas of concentrated simultaneous drilling, completion, construction, and production activities will be completed in as short a time as ... |
944 |
Concentrate development in 39.29% of the core acreage |
"Development (drilling, and completion activities) within the core area (48.36 sq.mi.) will be concentrated to a maximum of 19 sq. mi. in the three ... |
928 |
Conduct raptor surveys before commencing of ground-disturbing activities |
"Conduct appropriate raptor surveys before commencement of ground disturbing activities within 1 mile of proposed disturbance to determine status of ... |
936 |
Construct artificial nesting platforms |
"[I]n coordination with the USFWS and based on appropriate ecosystem management, construct artificial nesting platforms to encourage nesting away ... |
948 |
Encourage travel times between 9-3 |
"Reduce unnecessary traffic and encourage travel times to be during daylight hours between 9-3." |
938 |
Include USFWS in on-site reviews for future project sites |
"When possible, include the USFWS in on-site reviews for future project sites." |
935 |
Install anti-perching devices on structures to discourage use by raptors |
"To preclude bald eagles or other raptors from nesting on human-made structures such as cell phone towers and condensate tanks and to avoid impeding ... |
942 |
Minimize commuting traffic in crucial winter range by bussing rig crews |
"Commuting traffic will be minimized in crucial big game winter range and sage grouse winter concentration areas by bussing rig crews from staging ... |
941 |
Minimize surface disturbance and traffic on roads by scheduling routes |
"In addition to minimizing surface disturbance by restricting activities to existing roads, traffic on those roads will also be minimized to the ... |
929 |
Monitor activites that may impact raptor species, including bald eagles |
"Monitor any activities that may adversely impact bald eagles and other raptor species." |
937 |
Notify appropriate authorities of the presence of roadside carrion |
"As necessary, notify the appropriate authorities (Wyoming Department of Transportation on Highways and WGFD or BLM on rural and county roads) of the ... |
933 |
Prohibit extremely loud noises within 1 mile of active bald eagle nests |
"Prohibit activities that produce extremely loud noises within 1 mile of active bald eagle nests during nesting periods unless greater tolerance to ... |
930 |
Restrict activities near active raptor nests between courtship and fledging |
"Restrict activities within 0.5 mile of active raptor nests (1 mile of active bald eagle and ferruginous hawk nests) from the period of early ... |
946 |
Review development plans to allow for new construction in the summer months |
"Each year, the specific areas of concentrated activities will be determined through joint review of Proponent development plans. The Proponents ... |
945 |
Seasonally avoid moving drill rigs in crucial big game winter range |
"Plan activities to avoid to the extent practical moving drill rigs in crucial big game winter range after November 15 and before May 1, thereby ... |
931 |
Seasonally restrict activities near known bald eagle winter roosts |
"Restrict activities within 1 mile of known bald eagle winter roosts from November 1 to April 1, when activity has been verified. With assistance ... |
949 |
Shield pipeline installation equipment with camouflage netting |
"In areas within 1 mile of active nests where there is line of sight from active nests to the activity, pipeline installation equipment shall be ... |