You are viewing BMP records related to the Colorado Division of Wildlife's Actions to Minimize Adverse Impacts to Wildlife Resources (October 2008) publication.

BMP ID Short Title Text of BMP
3354 Apply certified weed free mulch and crimp to remain in reclamation areas. RESTORATION, RECLAMATION AND ABANDONMENT: "Establishing Reclaimed Areas: Apply certified weed free mulch and crimp or tacify to remain in place to ...
3289 Avoid direct discharge of pipeline hydrostatic test water into waterways. AQUATIC AND WETLAND: "Avoid direct discharge of pipeline hydrostatic test water to any reservoir, lake, wetland, or natural perennial or seasonally ...
3290 Avoid dust suppression activities within 300 feet of high water mark of any body of water. AQUATIC AND WETLAND: "Avoid dust suppression activities within 300 feet of the ordinary high water mark of any reservoir, lake, wetland, or natural ...
3281 Avoid field fitting pipelines and reduce excessive ROW widths and reclamation. INFRASTRUCTURE LAYOUT: "Engineer pipelines to avoid field fitting and reduce excessive ROW widths and reclamation. "
3307 Avoid locating fluid pits within 300 feet of high water mark of any body of water. FLUID PIT WILDLIFE MEASURES: "Avoid locating fluid pits within 300 feet of the ordinary high water mark of any reservoir, lake, wetland, or natural ...
3249 Avoid new surface disturbance in key habitats. INFRASTRUCTURE LAYOUT: "Avoid new surface disturbance and placing new facilities in key wildlife habitats in consultation with CDOW."
3262 Avoid placing roads in channels of intermittent streams. INFRASTRUCTURE LAYOUT: "Develop a transportation plan to incorporate the following strategies: i. Avoid constructing any road segment in the channel ...
3285 Bore pipelines that cross perennial streams. AQUATIC AND WETLAND: "Bore pipelines that cross perennial streams."
3363 Census and assess utilization of reclaimed areas by target species. MONITORING: "Census and assess the utilization of the reclaimed areas by the target species."
4365 Choose reference areas as goals for reclamation RESTORATION, RECLAMATION AND ABANDONMENT: "Vegetative Cover Standard: Choose reference areas as goals for reclamation that have high wildlife value, ...
3324 Choose reference areas with high wildlife value as goals for reclamation. RESTORATION, RECLAMATION AND ABANDONMENT: "Vegetative Cover Standard: a. Choose reference areas as goals for reclamation which have high wildlife ...
3339 Close and reclaim roads not immediately necessary for development. RESTORATION, RECLAMATION AND ABANDONMENT: "Timing: c. Close and reclaim roads not necessary for development immediately, including removing all ...
3278 Cluster well pads in least sensitive areas. INFRASTRUCTURE LAYOUT: "Cluster well pads in the least environmentally sensitive areas."
3239 Collaborate early in the planning process to assess wildlife needs and establish guidelines. PLANNING INFRASTRUCTURE: "Bring operators, CDOW personnel and surface owners together early in the planning process to assess wildlife needs and ...
3368 Collaborate or fund research investigation into the impacts of oil and gas development activities on wildlife resources. A: "Collaborate and/or fund research investigation into the impacts of oil and gas development activities on wildlife resources."
3257 Combine and share roads. INFRASTRUCTURE LAYOUT: "Develop a transportation plan to incorporate the following strategies: d. Combine and share roads to minimize habitat ...
3256 Combine infrastructure planning with roadway planning to avoid separate utility corridors. INFRASTRUCTURE LAYOUT: "Develop a transportation plan to incorporate the following strategies: c. Combine utility infrastructure (gas, electric, and ...
3253 Complete drilling within an uninterrupted time period. INFRASTRUCTURE LAYOUT: "Complete all anticipated drilling within a phased, concentrated, development area during a single, uninterrupted time period."
3342 Complete final reclamation activities immediately following plugging and abandonment. RESTORATION, RECLAMATION AND ABANDONMENT: "Timing: g. Complete final reclamation activities so that seeding occurs during the first optimal season ...
3362 Conduct reclamation and invasive plant montoring MONITORING: "Conduct necessary reclamation and invasive plant monitoring."