University of Colorado at Boulder
BMP of Oil and Gas Development

Browse BMPs

You are viewing BMP records related to the Wildlife Management Guidelines for Oil and Gas Development publication.

BMP ID Short Title Text of BMP
1 Base number of active rig locations on important fish/wildlife habitats "The formal consultation between the CDOW and the BLM and USFS should result in selecting the number of active rig locations allowed at any given ...
3 Comply with all required BMPs and Storm Water Discharge Regulations "All Storm Water Discharge Permitting Regulations and BMP's currently required by the State of Colorado must be strictly complied with, particularly ...
2828 Comply with all Storm Water Discharge Permit Regulations "Erosion and polluted runoff from oil and gas operations must be controlled. All Storm Water Discharge Permitting Regulations and BMP's currently ...
255 Drill all wells on a pad continuously until finished. "To shorten the time of on-going disturbance, once drilling has started on a surface pad, drilling should continue on that pad until all wells needed ...
264 Enforce lease terms rigorously. "Make timely inspections and enforcement of all lease terms a high priority."
262 Ensure mill levy funds remain available for life of well. "In cases where industry pays a mill levy to the state based upon production, provisions must be made to ensure that these funds remain available for ...
259 Establish a citizen advisory group. "In addition, consider establishing a citizen advisory group, which would include members of the public, and which would meet periodically to assess ...
261 Implement a reclamation guarantee system. "Implement a reclamation guarantee system that follows a well regardless of its ownership."
256 Implement all BMPs applicable to a site. "Require the implementation of all applicable Best Management Practices utilizing best available technologies to minimize and mitigate surface ...
257 Implement and supervise a monitoring system. "As soon as possible, assemble an interagency technical review team and secure sufficient funding to enable effective implementation and supervision ...
2827 Install water re-use systems "While directional drilling may initially be more costly than vertical drilling, directional drilling provides many opportunities to reduce other ...
4 Maintain buffers of 500 feet for riparian areas "Adequate buffers of at least 500 feet must be maintained for all stream riparian areas."
2831 Maintain sediment input levels below baseline conditions "Sediment input levels must not be increased above baseline conditions."
2829 Maintain stream/riparian buffers "Adequate buffers of at least 500 feet must be maintained for all stream riparian areas."
248 Maximize distance between pads for downhole drilling. "Maximize the distance between pads used for downhole drilling... The Colorado Oil and Gas Conservation Commission should determine the appropriate ...
249 Maximize use of directional drilling. "Maximize the use of directional drilling, based upon the best available technology."
251 Minimize area of pad disturbance. "Minimize the total area of pad disturbance to that acreage required to implement maximum surface well spacing."
250 Minimize road construction to well locations. "Minimize the length of new roads constructed to service well locations, and utilize existing roads to the maximum degree possible."
258 Monitor use of hazardous chemicals. "Furthermore, the use, disposal, and movement of all listed hazardous chemicals should be tracked, recorded, and reported to the Department of ...
5 Restore degraded riparian areas "If these areas are currently degraded, cooperative efforts should be undertaken to restore them to healthy and functional riparian systems."
Page:<< Previous|12|Next >>   Goto to page: