BMP ID Short Title Text of BMP
9220 Additional Requirements for Multi-Well Pit Construction "2. Operator's Pit Practices within the County. ... f. Multi-Well Pits: ... Additional requirements, such as fencing, may be required by the County, ...
9288 Baseline Testing Private Water Wells Near Facility "6. Baseline Water Quality Testing. ... c. Private Water Well Owner Request. Operator agrees to conduct a baseline test of any water well requested ...
11855 Baseline Testing Water at Facilities where Rule 609 Does Not Apply "4. Baseline Water Quality Testing. ... d. For a location that will include only facilities where Rule 609 does not require Baseline Sampling (flow ...
9287 Baseline Testing Water Sources if No Source is Within 1/2 Mile Radius "6. Baseline Water Quality Testing. ... b. No available water sources within one half mile: If there are no available water sources located within a ...
9286 Baseline Testing Water Sources Near Operation "6. Baseline Water Quality Testing. ... a. Criteria and Protocol: Using the Commission's criteria and protocol for sample analyses, types, ...
9230 Berm Inspection and Repair "3. Berms. Berms shall be inspected by Operator on a weekly basis for evidence of discharge. Berms shall be inspected within 48 hours of a ...
9297 Bond Collateral for Erosion Control and Emergency Response Applications "11. Erosion Control. ... A general performance bond in a form and amount acceptable to the County will also be allowed to guarantee performance ...
9296 Collateral for Erosion Control Permit "11. Erosion Control. ... the County will also accept a blanket collateral in a form and amount acceptable to the County so that separate collateral ...
9295 Common Erosion Control Permit Application for All Facilities "11. Erosion Control. ... The County will permit the Operator to submit a standard GESC plan applicable to all of the Operator's oil and gas ...
9188 Construction and Documentation Requirements for Discouraged Pits "2. Operator's Pit Practices within the County. ... c. Additional Pits that Require County Review and Approval: ... Construction of these pits will ...
9205 Contaminant Separation Requirements in Multi-Well Pits "2. Operator's Pit Practices within the County. ... f. Multi-Well Pits: ... Fluids stored in multi-well pits will be circulated through a four-phase ...
9180 Contaminants Monitoring in Open Pits "2. Operator's Pit Practices within the County. ... b. Water Storage Pits to Contain Fresh Water or Brine Water: ... As long as the pit is open and ...
9191 Contaminants Testing Upon Pit Closure "2. Operator's Pit Practices within the County. ... c. Additional Pits that Require County Review and Approval: ... Upon closure of these pits, pH, ...
9232 County and Operator Will Meet to Discuss Operations "4. Regular Meetings to Monitor and Discuss MOU Issues. The County and Operator agree to meet quarterly or as necessary, to monitor and discuss any ...
9315 County Inspections of Operation "17. County Inspections. Operator agrees to allow County access to all oil and gas facilities for inspection, provided County personnel are equipped ...
11853 County Must Authorize Pits Within 1/4 mile of Occupied Buildings Except in Emergencies "1. Operator’s Pit Practices within the County. ... a. ... Use of these [flare, emergency, plugging and work-over] pits except emergency pits, ...
9183 Discouraged Pit Types "2. Operator's Pit Practices within the County. ... c. Additional Pits that Require County Review and Approval: Skimming, settling, percolation, ...
9292 Emergency Response Plan "10. Emergency Response Plan. Operator will provide the County with an Emergency Response Plan (ERP) to address all potential emergencies that may be ...
9294 Erosion Control Permit "11. Erosion Control. When required by the County's Grading and Erosion/ Sedimentation ("GESC") Regulations, the Operator agrees to apply for and ...
9285 Groundwater Baseline Monitoring "6. Baseline Water Quality Testing. Operator agrees to comply with the Commission's Statewide Groundwater Baseline Sampling and Monitoring Rule 609, ...