You are viewing BMP records related to the Memorandum of Understanding between Town of Erie and Encana Oil and Gas, 2012 publication.

BMP ID Short Title Text of BMP
9016 Landowner notification "2. Prior to commencement of any new drilling or completion operations, provide notification to landowners within one-half (1 /2) mile of the ...
9015 Maximize setbacks "1. Maximize equipment and wellhead setbacks from occupied buildings and residences to the extent feasible and practicable, as determined by Encana."
9084 Noise, light, and dust mitigation plan "3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the wellsite for ...
9086 Plan changes and updates "3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the wellsite for ...
9083 Reclamation plan "3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the wellsite for ...
9082 Site plan for preparation, mobilization, and demobilization "3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the wellsite for ...
9081 Summary of planned operations "3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the wellsite for ...
9085 Traffic management plan "3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the wellsite for ...
9386 Utilize a high-low pressure vessel and vapor recovery unit "6. Utilize a high-low pressure vessel (HLP) and vapor recovery unit (VRU) for new wells drilled. Encana may remove the VRU system at such time ...
9385 Utilize closed-loop systems "5. Utilize closed-loop systems for drilling and completion operations to minimize the need for earthen pits."
9384 Utilize steel-rim berms "4. Utilize steel-rim berms around tanks and separators instead of sand or soil berms."