10331 |
Action plan if methane concentration increases |
"5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ... |
10330 |
Action plan if testing reveals thermogenic or intermediate mix |
"5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature. annual testing shall be ... |
10512 |
Additional post completion water tests |
"5.2 Water Well Monitoring. . . . Additional 'post completion' test(s) may be required if changes in water quality are identified during follow-up ... |
10286 |
Adoption of Road Impact Fee Program |
"3.3. Adoption of Road Impact Fee Program. The County is presently undertaking a feasibility study for the imposition of a county-wide impact fee ... |
10329 |
Annual testing if testing reveals thermogenic or intermediate mix |
"5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature. annual testing shall be ... |
10263 |
Applicable federal regulations |
"4. Compliance with all applicable regulations of the BLM, BIA and the Southern Ute Indian Tribe when conducting operations on lands subject such ... |
10273 |
Calculating degree of noncomformity with setback requirements |
"2.4 Legal Non-Conforming Uses and Setbacks. . . . The increase, if any, in degree of nonconformity shall be the net difference between the two . . . ... |
10519 |
COGCC-ordered remediation if monitoring reveals a possible lack of zonal isolation |
"[6] . . .If the monitoring reveals a possible lack of zonal isolation, the COGCC may then conduct or order any necessary remediation or other ... |
11917 |
Compliance terms |
"2. Compliance with the terms and provisions of all the Commission's health, safety, welfare and environmental rules and regulations now or hereafter ... |
11916 |
Compliance terms |
"1. Compliance with all terms, conditions and provisions of prior Commission Orders in Cause No. 112, including without limitation, the specific ... |
10302 |
Comply with weight restrictions |
"3.7 Produced Water Hauling. . . . In those instances where the utilization of a water hauling truck is required, MARALEX agrees to strictly comply ... |
10327 |
Compositional analysis and carbon isotopic analyses |
"5.2 Water Well Monitoring. . . . If free gas or a methane concentration level greater than 2 mg/L is detected in a water quality testing well, ... |
10514 |
Copies of water test results provided |
"5.2 Water Well Monitoring. . . . Within three (3) months of collecting the samples used for the test, copies of all test results described above ... |
10277 |
County exercises good faith in performing road work from impact fees |
"3.1 Road Impact Fees. County and MARALEX have determined that specific land use activities by MARALEX within the Infill Application Area may create ... |
10291 |
County provides notice of intended projects |
"3.4. Submission of Information. . . . The County agrees to reciprocate and provide notice to MARALEX of their intended projects and its expected ... |
10278 |
County shall control road impact work |
"3.1 Road Impact Fees. . . The County shall control the sequencing and timing of such [road impact] work." |
10275 |
Demonstrate reasonableness of Well Pad expansion |
"2.5 Expansion of Existing Well Pads. . . . The reasonableness of the expansion [of existing well pads] under the circumstances shall be demonstrated ... |
10260 |
Density of well pads |
"2.1 Density. MARALEX agrees that, except as provided in Article 2.2 herein or as may be otherwise permitted in the COGCC order approving MARALEX' S ... |
10265 |
Density rule limitation shall not apply when County denies a permit application |
"2.2 Well Location; Exceptions. . . . The limitation contained in Section 2. 1 shall not apply in any instance in which the County denies a permit ... |
10304 |
Electric motors for artificial lift installations more than 1320 of distribution |
"4.1 Electrification. . . MARALEX agrees that if distribution voltage is not currently within 1320 feet of the proposed Well Pad, it will contact ... |