BMP ID |
Short Title |
Text of BMP |
---|
11520 |
"4.6. Flaring and Venting. ...In addition, Applicant agrees to abide by any requirements or restrictions implemented by the County when issuing Stage |
"4.6. Flaring and Venting. ...In addition, Applicant agrees to abide by any requirements or restrictions implemented by the County when issuing Stage ... |
11523 |
"4.7. Dust Control. Applicant agrees to suppress dust throughout construction, drilling, completion, and operational activities through best managemen |
"4.7. Dust Control. Applicant agrees to suppress dust throughout construction, drilling, completion, and operational activities through best ... |
11802 |
Applicable federal regulations |
"3. Compliance with all applicable regulations of the BLM, BIA and the Southern Ute Indian Tribe when conducting operations on lands subject to such ... |
11504 |
Applicant liable for damage to road in excess to cost estimated |
"3.5. Use of Equipment. Applicant agrees that: ...d. Road maintenance and improvement fees outlined in Section 3.2 are designed to recoup the ... |
11515 |
Applicant must comply with air quality laws and regulations |
"4.4. Compliance with Air Quality Laws and Regulations. Applicant will comply with existing federal and state laws and regulations applicable to its ... |
11519 |
Applicant to conduct flaring and venting according to COGCC rules |
"4.6. Flaring and Venting. Applicant agrees to conduct flaring and venting practices in accordance with COGCC Rules 317.1., 805.b.(3)B.v., ... |
11512 |
Applicant to contact surface owner opportunity to extend voltage |
"4.3. Electrification. ...The applicant will contact and provide the surface owner an opportunity, at the surface owner's cost, to extend ... |
11528 |
Applicant to provide documentation of legal water to be used |
"5.3. Demonstration of Water Source. Pursuant to 90-123(e) Applicant agrees to provide documentation to the County demonstrating a legally obtained ... |
11517 |
Applicant to use no or low bleed pneumatic devices |
"4.5. Emission Control Equipment. ...Applicant further agrees to use no bleed or low bleed pneumatic devices in accordance with COGCC Rule ... |
11516 |
Applicant use emission control equipment capable of at least 95% control |
"4.5 Emission Control Equipment. In accordance with applicable Air Quality laws and regulations set forth in Section 4.4, Applicant agrees to utilize ... |
11531 |
Applicant will comply with mitigation measures of COGCC and LPLUC |
"[7] Applicant agrees to utilize and comply with the mitigation measures set forth in LPLUC Sections 90-122, 123 and 124. Further, upon the effective ... |
11501 |
Applicant will remove tire chains unless necessary for safety |
"3.5. Use of Equipment. Applicant agrees that: a. it will remove or require the removal of tire chains from its heavy equipment before entering a ... |
11487 |
Coleman waives right to dictate road work |
"3.1 Road Maintenance and Improvement Fees:. . .Applicant hereby waives its rights, if any, to insist upon completion of the work or to dictate the ... |
11800 |
Compliance terms |
"1. Compliance with all terms, conditions and provisions of prior Commission Orders in Cause 112." |
11801 |
Compliance terms |
"2. Compliance with the terms and provisions of all of the Commission 's health, safety, welfare and environmental rules and regulations now ... |
11527 |
Comply with COGCC rules on water well monitoring |
"5.2. Water Well Monitoring. At a minimum, Applicant agrees to comply with and perform water well monitoring at the Infill Wells in conformance with ... |
11506 |
Comply with weight restrictions |
"3.6 Produced Water Hauling. In those instances where the utilization of a water hauling truck is required, Applicant agrees to strictly comply with ... |
11485 |
County exercises good faith in performing road work from impact fees |
"3.1 Road Maintenance and Improvement Fees. County and Applicant have determined that specific land use activities by Applicant within the Infill ... |
11486 |
County shall control road impact work |
"3.1 Road Maintenance and Improvement Fees: . . . The County shall control the sequencing and timing of such [road impact] work" |
11483 |
Demonstrate reasonableness of Well Pad expansion |
"2.5 Expansion of Existing Well Pads. . . . The reasonableness of the expansion under the circumstances shall be demonstrated by Applicant to the ... |