BMP ID |
Short Title |
Text of BMP |
---|
11831 |
Baseline Testing Private Water Wells in Near Facility |
"7. Baseline Water Quality Testing. ... c. Private Water Well Owner Request. Operator agrees to conduct a baseline test of any water well requested ... |
11830 |
Baseline Testing Water Nearest Source in 1 Mile Radius if No Source is Within 1/2 Mile Radius |
"7. Baseline Water Quality Testing. ... b. No available water sources within one half mile: If there are no available water sources located within a ... |
11829 |
Baseline Testing Water Sources Near Operation |
"7. Baseline Water Quality Testing. ... a. Criteria and Protocol: Using the COGCC's criteria and protocol for sample analyses, types, orientation, ... |
11824 |
Berm Inspection and Construction |
"4. Berms. Berms shall be inspected by Operator on a weekly basis for evidence of discharge. Berms shall be inspected within 48 hours of a ... |
11819 |
Closed-loop or Modified Closed-loop Systems for Pits |
"2. Operator's Pit Practices within the County. The Operator will comply, at minimum, with the following pit practices after the date this MOU is ... |
11852 |
County Inspections of Operation |
"20. County Inspections. Operator agrees to allow County access to all oil and gas facilities for inspection, provided County personnel are equipped ... |
11845 |
County May Inspect Access Road at Own Risk |
"15. Private Roads. Operator and County agree that spot inspections of access roads may be done by the County and/or appropriate emergency response ... |
11847 |
Disturbances in a Floodplain Require County Permit |
"17. Floodplain. Any disturbance within a floodplain will require the Operator to obtain a Floodplain Development Permit from the County and to ... |
11820 |
Fresh Water Storage Pits Permitted for Water That Meets Standards |
"2. Operator's Pit Practices within the County. The Operator will comply, at minimum, with the following pit practices after the date this MOU is ... |
11827 |
Groundwater Baseline Sampling |
"7. Baseline Water Quality Testing. Operator agrees to comply with the COGCC Rule 609 for Baseline Water Quality Testing as adopted or hereafter with ... |
11837 |
Inside of Berm Will Be Kept Free of Vegetative Growth |
"10. Weed Control and Management. ... Operator shall keep area inside berm area free of vegetative growth." |
9148 |
Locating Lawful Water Source |
"6. Water Supply and Quality. In an effort to reduce truck traffic, where feasible, the Operator will identify a water source lawfully available for ... |
11825 |
Monitoring Communication Between County and Operator |
"5. Regular Meetings to Monitor and Discuss MOU Issues. The County and Operator agree to meet quarterly or as necessary, to monitor and discuss any ... |
11839 |
Noise Complaint Contact Information |
"12. Noise. Operator shall provide and post 24-hour, 7 days per week contact information to deal with all noise complaints arising from Operator's ... |
11822 |
Operational Impacts at Wells With Setbacks Less Than 1000 Feet Must Be Mitigated |
"3. Setbacks. Any setbacks less than one-thousand feet (1000') from a building unit or outdoor venue or recreation area as defined by COGCC, shall be ... |
11833 |
Operator Spill Reporting to County |
"8. Spill and Release Management. Any spill or release that is reportable to the COGCC Rule 906 and any changes and/or amendments shall be ... |
11834 |
Operator Stormwater Management Plan |
"9. Storm Water Management, Site Preparation and Stabilization. Operator will provide the County copies of their Stormwater Management Plan and Post ... |
11844 |
Operator Will Contruct and Maintain Access Road to Well |
"15. Private Roads. The Operator agrees to construct (unless already constructed) and maintain an access road as set forth in the Road Maintenance ... |
11841 |
Operator Will Develop and Provide County with an Emergency Response and Safety Plan |
"13. Emergency Response and Safety Plan. Operator will provide the County with an Emergency Response and Safety Plan (ERSP) that has been developed ... |
11835 |
Operator Will Implement Stormwater Runoff BMPs Throughout Operation of Well |
"9. Storm Water Management, Site Preparation and Stabilization. ... Oil and gas operators shall implement and maintain BMPs at all oil and gas ... |