BMP ID |
Short Title |
Text of BMP |
---|
2593 |
A Material Safety Data Sheet for every chemical or hazardous material brought on-site shall be kept on file. |
"In accordance with 29 CFR § 1910.1200, a Material Safety Data Sheet for every chemical or hazardous material brought on-site would be kept on ... |
1827 |
A pre-disturbance species composition required per site. |
Reclamation: "A pre-disturbance species composition list must be developed for each site if the project encompasses an area where there are several ... |
4547 |
A professional engineer must design all roads |
Transportation Planning: "2. All roads should be designed by a professional engineer." |
4911 |
A strategy will be developed to acquire data in a timely manner |
Standards for Healthy Rangelands: "Implementation of the Wyoming standards will generally be done in the following manner. If a lack of data ... |
4141 |
Abandoned road reclamation would require reshaping, recontouring, and resurfacing |
"Developed or Designed Roads: Reclamation of abandoned roads would include requirements for reshaping, recontouring, resurfacing with topsoil, ... |
1820 |
Abandoned sites must be satisfactorily rehabilitated |
Reclamation: "Abandoned sites must be satisfactorily rehabilitated in accordance with a plan approved by the BLM. " |
3753 |
Above ground facilities will not be located near active raptor nests |
"Well pads, access roads, and other aboveground facilities will not be located within 825 feet of an active raptor nest, within 1,000 feet of an ... |
1042 |
Aboveground facilities will not be located near raptor nests |
"Well pads, access roads, and other aboveground facilities will not be located within 825 feet of an active raptor nest, within 1,000 feet of an ... |
2641 |
Accomplish reclamation as soon as possible after disturbance; continue efforts until site is stabilized |
"Reclamation: All reclamation is expected to be accomplished as soon as possible after the disturbance occurs, with efforts continuing until a ... |
2119 |
Acknowledge potential conflicts |
"Administrative/Regulatory (BLM): Acknowledge potential conflicts." |
1538 |
Acquire permits from the appropriate federal and state agencies before manipulating or destroying a raptor nest |
"If nest manipulation or a situation requiring a 'taking' of a raptor nest becomes necessary, a special permit will be obtained from the Denver ... |
578 |
Acquire specific approval from the BLM for facility construction in areas requiring repeated human presence. |
"Facility construction in these areas [requiring repeated human presence] would require specific approval from the BLM." |
7202 |
Add a supply of water to farm and ranch operations |
"Other low impact practices: Add[] a supply of water to farm and ranch operations in the southeast portion of the basin." |
2383 |
Add mitigation measures if determined as necessary by BLM biologist |
"Additional mitigation measure may be necessary if the site-specific project is determined by a BLM biologist to have adverse effects to black-footed ... |
2378 |
Add mitigation measures if determined as necessary by BLM biologist |
"Additional mitigation measures may be necessary if the site-specific project is determined by a BLM biologist to have adverse effects to bald eagles ... |
1718 |
Additional NEPA analysis required for compressor facilities within 4 miles of residences |
Air Quality: "To avoid incremental risk of exposure to carcinogenic toxins from compressor facilities, any compressor facility located closer than 4 ... |
2566 |
Address configuration of reshaped topography, drainage systems, and other surface manipulations in reclamation plans |
Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individualPOD facility abandonment via a ... |
2567 |
Address configuration of reshaped topography, drainage systems, and other surface manipulations in reclamation plans |
Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individualPOD facility abandonment via a ... |
2573 |
Address decommissioning/removal of surface facilities in reclamation plans |
Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individualPOD facility abandonment via a ... |
2570 |
Address practices that reclaim and stabilize disturbed areas in reclamation plans |
Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individualPOD facility abandonment via a ... |