Title: Install Plunger Lift Systems in Gas Wells
Text: Installing a plunger lift system is a cost-effective alternative for removing liquids. Plunger lift systems have the additional benefit of increasing production, as well as significantly reducing methane emissions associated with blowdown operations. A plunger lift uses gas pressure buildup in a well to lift a column of accumulated fluid out of the well. The plunger lift system helps to maintain gas production and may reduce the need for other remedial operations.
Source Publication Name: Connect Casing to Vapor Recovery Unit
Citation Section: Lessons Learned
Citation Page:
Supplemental Documents:  
Usage Type: Recommended
Timing: • Production / Operation / Maintenance
Oil / Gas Field:  
Surface Ownership: • Federal
• State
• Private
Mineral Ownership: • Federal
• State
• Private
Primary Contact: Environmental Protection Agency
Ariel Rios Building, 1200 Pennsylvania Avenue, N.W.
Washington, DC  20460  United States
Phone:(202) 272-0167     Alt. Phone:(202) 272-0165
Fax:     E-mail: 
Alternate Contact:  
 
Categories: Air Quality and Emissions
Location: General / Federal
Species:
Vegetation Types:
General Comments:
Cost-Benefit Analysis: The installation of a plunger lift system serves as a cost-effective alternative to beam lifts and well blowdown and yields significant economic and environmental benefits. The extent and nature of these benefits depend on the liquid removal system that the plunger lift is replacing. *Lower capital cost versus installing beam lift equipment. *Lower well maintenance and fewer remedial treatments. *Continuous production improves gas production rates and increases efficiency. *In calculating the economic benefits of plunger lifts, the savings from avoided emissions are only one of many factors to consider in the analysis. Additional savings may result from the salvage value of surplus production equipment and the associated reduction in electricity and work over costs. Moreover, wells that move water continuously out of the well bore have the potential to produce more condensate and oil.
BMP Efficacy: *Reduced paraffin and scale buildup. *Lower methane emissions.