You are viewing BMP records related to the La Sal 3D Geophysical Project publication.

BMP ID Short Title Text of BMP
7818 A person qualified to identify well-developed soil crusts will be available to monitor activities in areas of such crusts. Soils and Vegetation: "A person qualified to identify well-developed soil crusts will be available to monitor activities in areas of such crusts. ...
7835 All ATVs will be equipped with spark arrestors and all 4-wheel drive buggies will be diesel powered. Fire Protection: "All ATVs [All Terrain Vehicles] will be equipped with spark arrestors and all four-wheel drive buggies will be diesel powered. All ...
7834 All equipment will be maintained to minimize exhaust emissions and noise Air Quality/Noise: "All vehicles and construction equipment will be properly maintained to minimize exhaust emissions and will be properly muffled to ...
7829 All flagging, and other debris will be gathered daily and disposed of Waste: "All pin flags, flagging, and other debris will be gathered daily and disposed of at an approved site or landfill."
7790 All gates within the project area will be left as they are found. Range: "All gates within the project area will be left as they are found (i.e., open gates will be left open, closed gates will be closed)."
7796 All geophysical operations will be conducted in accordance with BLM Handbook H-3150-1 and Manual. General: "All geophysical operations will be conducted in accordance with BLM Handbook H-3150-1 and Manual."
7797 All geophysical operations will be conducted in accordance with COAs developed from the RMP for the BLM's Moab FO. General: "All geophysical operations will be conducted in accordance with COAs [Conditions of Approval] developed from the RMP [Resource management ...
7795 All geophysical operations will be executed in accordance with applicable federal, state, and local regulations. General: "All geophysical operations will be executed in accordance with applicable federal, state, and local regulations. Measures will be taken to ...
7830 All oil, diesel, or hydraulic fluid spills will be cleaned up immediately and removed, including any contaminated soils. Waste: "All oil, diesel, or hydraulic fluid spills will be cleaned up immediately and removed, including any contaminated soils. All spill-related ...
7794 Apply dust control measures as appropriate to control air quality Air Quality: "Dust control measures, as approved by the BLM [Bureau of Land Management], will be applied as appropriate. Water will be used to ...
7787 Conduct raptor surveys during nesting season Wildlife Resource Protection: "If project activities are to occur during raptor mating/nesting season (March 1-August 31), surveys will be conducted ...
7788 Conduct surveys during migratory birds' typical nesting season Wildlife Resource Protection: "If project activities are to occur during migratory birds typical nesting season (typically April 1st -July 315t), ...
7813 Cross-country vehicular travel will be avoided. Soils and Vegetation: "Cross-country vehicular travel will be avoided."
7815 Disturbed areas will be reseeded using a mix specified by the AO at a time when seed germination is facilitated by natural conditions. Soils and Vegetation: "Disturbed areas, where a site will not naturally revegetate in a reasonable time or areas where soil stability is threatened ...
7810 Drill holes will be stacked to avoid riparian areas, wetlands, sensitive plants, steep slopes, or other areas of concern. Soils and Vegetation: "Drill holes will be stacked to avoid riparian areas, wetlands, sensitive plants, steep slopes, or other areas of concern."
7822 Drill holes will offset springs by offsets approved by the applicable regulatory authorities. Surface Water: "Drill holes will offset springs by offsets approved by the applicable regulatory authorities."
7808 Drilling and data acquisition operations will use existing roads and trails where possible. Soils and Vegetation: "Drilling and data acquisition operations will use existing roads and trails where possible."
7807 Drilling will be conducted no closer than 100 feet from edges of cliffs or upland escarpments. Soils and Vegetation: "Drilling will be conducted no closer than 100 feet from edges of cliffs or upland escarpments."
7832 Each shot will be cleared and secured by the trained shooting personnel prior to its detonation. Safety: "Each shot will be cleared and secured by the trained shooting personnel prior to its detonation. GRER [Green River Energy Resources] ...
7827 Gates will be used for crossing fences wherever practical. Range: "Gates will be used for crossing fences wherever practical. If a fence must be crossed by a vehicle at a location other than an existing gate, ...