BMP ID |
Short Title |
Text of BMP |
---|
7818 |
A person qualified to identify well-developed soil crusts will be available to monitor activities in areas of such crusts. |
Soils and Vegetation: "A person qualified to identify well-developed soil crusts will be available to monitor activities in areas of such crusts. ... |
7835 |
All ATVs will be equipped with spark arrestors and all 4-wheel drive buggies will be diesel powered. |
Fire Protection: "All ATVs [All Terrain Vehicles] will be equipped with spark arrestors and all four-wheel drive buggies will be diesel powered. All ... |
7834 |
All equipment will be maintained to minimize exhaust emissions and noise |
Air Quality/Noise: "All vehicles and construction equipment will be properly maintained to minimize exhaust emissions and will be properly muffled to ... |
7829 |
All flagging, and other debris will be gathered daily and disposed of |
Waste: "All pin flags, flagging, and other debris will be gathered daily and disposed of at an approved site or landfill." |
7790 |
All gates within the project area will be left as they are found. |
Range: "All gates within the project area will be left as they are found (i.e., open gates will be left open, closed gates will be closed)." |
7796 |
All geophysical operations will be conducted in accordance with BLM Handbook H-3150-1 and Manual. |
General: "All geophysical operations will be conducted in accordance with BLM Handbook H-3150-1 and Manual." |
7797 |
All geophysical operations will be conducted in accordance with COAs developed from the RMP for the BLM's Moab FO. |
General: "All geophysical operations will be conducted in accordance with COAs [Conditions of Approval] developed from the RMP [Resource management ... |
7795 |
All geophysical operations will be executed in accordance with applicable federal, state, and local regulations. |
General: "All geophysical operations will be executed in accordance with applicable federal, state, and local regulations. Measures will be taken to ... |
7830 |
All oil, diesel, or hydraulic fluid spills will be cleaned up immediately and removed, including any contaminated soils. |
Waste: "All oil, diesel, or hydraulic fluid spills will be cleaned up immediately and removed, including any contaminated soils. All spill-related ... |
7794 |
Apply dust control measures as appropriate to control air quality |
Air Quality: "Dust control measures, as approved by the BLM [Bureau of Land Management], will be applied as appropriate. Water will be used to ... |
7787 |
Conduct raptor surveys during nesting season |
Wildlife Resource Protection: "If project activities are to occur during raptor mating/nesting season (March 1-August 31), surveys will be conducted ... |
7788 |
Conduct surveys during migratory birds' typical nesting season |
Wildlife Resource Protection: "If project activities are to occur during migratory birds typical nesting season (typically April 1st -July 315t), ... |
7813 |
Cross-country vehicular travel will be avoided. |
Soils and Vegetation: "Cross-country vehicular travel will be avoided." |
7815 |
Disturbed areas will be reseeded using a mix specified by the AO at a time when seed germination is facilitated by natural conditions. |
Soils and Vegetation: "Disturbed areas, where a site will not naturally revegetate in a reasonable time or areas where soil stability is threatened ... |
7810 |
Drill holes will be stacked to avoid riparian areas, wetlands, sensitive plants, steep slopes, or other areas of concern. |
Soils and Vegetation: "Drill holes will be stacked to avoid riparian areas, wetlands, sensitive plants, steep slopes, or other areas of concern." |
7822 |
Drill holes will offset springs by offsets approved by the applicable regulatory authorities. |
Surface Water: "Drill holes will offset springs by offsets approved by the applicable regulatory authorities." |
7808 |
Drilling and data acquisition operations will use existing roads and trails where possible. |
Soils and Vegetation: "Drilling and data acquisition operations will use existing roads and trails where possible." |
7807 |
Drilling will be conducted no closer than 100 feet from edges of cliffs or upland escarpments. |
Soils and Vegetation: "Drilling will be conducted no closer than 100 feet from edges of cliffs or upland escarpments." |
7832 |
Each shot will be cleared and secured by the trained shooting personnel prior to its detonation. |
Safety: "Each shot will be cleared and secured by the trained shooting personnel prior to its detonation. GRER [Green River Energy Resources] ... |
7827 |
Gates will be used for crossing fences wherever practical. |
Range: "Gates will be used for crossing fences wherever practical. If a fence must be crossed by a vehicle at a location other than an existing gate, ... |