University of Colorado at Boulder
BMP of Oil and Gas Development

Browse BMPs

You are viewing BMP records related to the Memorandum of Understanding Between the Board of County Commissioners of La Plata County, Colorado and BP America Production Company, 2005 publication.

BMP ID Short Title Text of BMP
10457 Action plan if methane concentration increases "5.2 Water Well Monitoring. . . . If the methane concentration level increases by more than 5 mg/L between sampling periods, or increases to more ...
10456 Action plan if testing reveals thermogenic or intermediate mix "5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature . . . an action plan shall be ...
10462 Additional post completion water tests "5.2 Water Well Monitoring. . . . Additional "post completion" test(s) may be required if changes in water quality are identified during follow-up ...
9866 Adoption of Road Impact Fee Program "3.3 Adoption of Road Impact Fee Program. The County is presently undertaking a feasibility study for the imposition of a county-wide impact fee ...
10455 Annual testing if testing reveals thermogenic or intermediate mix "5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature, annual testing shall be ...
9862 BP waives right to dictate road work "3.1 Road Impact Fees. . . . BP hereby waives its rights, if any, to insist upon completion of the [road] work or to dictate the manner, sequencing ...
9857 Calculating degree of noncomformity with setback requirements "2.4 Legal Non-Conforming Uses and Setbacks. The increase, if any, in degree of nonconformity shall be the net difference between the two above ...
10469 COGCC-ordered remediation if monitoring reveals a possible lack of zonal isolation "If the monitoring reveals a possible lack of zonal isolation, the COGCC may then conduct or order any necessary remediation or other authorized ...
9877 Comply with weight restrictions "3.7 Produced Water Hauling. . . . In those instances where the utilization of a water hauling truck is required, BP agrees to strictly comply with ...
10453 Compositional analysis and carbon isotopic analyses "5.2 Water Well Monitoring . . . . If free gas or a methane concentration level greater than 2 mg/L is detected in a water quality testing well, ...
10464 Copies of water test results provided "5.2 Water Well Monitoring. . . . Within three (3) months of collecting the samples used for the test, copies of all test results described above ...
9861 County exercises good faith in performing road work from impact fees "3.1 Road Impact Fees. County and BP have determined that specific land use activities by BP within the Infill Application Area may create impacts on ...
9870 County provides notice of intended projects "3.4 Submission of Information. . . . The County agrees to reciprocate [BP provision of notice on travel routes and plans] and provide notice to BP ...
9859 Demonstrate reasonableness of Well Pad expansion "2.5 Expansion of Existing Well Pads: The reasonableness of the expansion [of existing well pads] under the circumstances shall be demonstrated by ...
9844 Density of well pads "2.1 Density. BP agrees that, except as provided in Article 2.2 herein or as may be otherwise permitted in the COGCC order approving BP's Infill ...
9849 Density rule limitation shall not apply when County denies a permit application ""2.2 Well Location; Exceptions. . . . The limitation [on well pad density] contained in Section 2.1 shall not apply in any instance in which the ...
9845 Drill future wells on existing well pads "2.2 Well Location; Exceptions. The County believes that the potential impacts attendant to future gas development would be best mitigated for the ...
9879 Electric motors for artificial lift installations more than 1320 of distribution "4.1 Electrification . . . BP agrees that if distribution voltage is not currently within 1320 feet of the proposed Well Pad, it will contact and ...
9878 Electric motors for artificial lift installations within 1320 feet of distribution "4.1 Electrification. BP agrees that with respect to Infill Wells within the Infill Application Area requiring long-term artificial lift, it shall ...
9884 Emission control equipment "4.3 Emission Control Equipment. BP will comply with existing EPA rules and any future regulations validly adopted by an authority with appropriate ...
Page:<< Previous|1234|Next >>   Goto to page: