10457 |
Action plan if methane concentration increases |
"5.2 Water Well Monitoring. . . . If the methane concentration level increases by more than 5 mg/L between sampling periods, or increases to more ... |
10456 |
Action plan if testing reveals thermogenic or intermediate mix |
"5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature . . . an action plan shall be ... |
10462 |
Additional post completion water tests |
"5.2 Water Well Monitoring. . . . Additional "post completion" test(s) may be required if changes in water quality are identified during follow-up ... |
9866 |
Adoption of Road Impact Fee Program |
"3.3 Adoption of Road Impact Fee Program. The County is presently undertaking a feasibility study for the imposition of a county-wide impact fee ... |
10455 |
Annual testing if testing reveals thermogenic or intermediate mix |
"5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature, annual testing shall be ... |
9862 |
BP waives right to dictate road work |
"3.1 Road Impact Fees. . . . BP hereby waives its rights, if any, to insist upon completion of the [road] work or to dictate the manner, sequencing ... |
9857 |
Calculating degree of noncomformity with setback requirements |
"2.4 Legal Non-Conforming Uses and Setbacks. The increase, if any, in degree of nonconformity shall be the net difference between the two above ... |
10469 |
COGCC-ordered remediation if monitoring reveals a possible lack of zonal isolation |
"If the monitoring reveals a possible lack of zonal isolation, the COGCC may then conduct or order any necessary remediation or other authorized ... |
9877 |
Comply with weight restrictions |
"3.7 Produced Water Hauling. . . . In those instances where the utilization of a water hauling truck is required, BP agrees to strictly comply with ... |
10453 |
Compositional analysis and carbon isotopic analyses |
"5.2 Water Well Monitoring . . . . If free gas or a methane concentration level greater than 2 mg/L is detected in a water quality testing well, ... |
10464 |
Copies of water test results provided |
"5.2 Water Well Monitoring. . . . Within three (3) months of collecting the samples used for the test, copies of all test results described above ... |
9861 |
County exercises good faith in performing road work from impact fees |
"3.1 Road Impact Fees. County and BP have determined that specific land use activities by BP within the Infill Application Area may create impacts on ... |
9870 |
County provides notice of intended projects |
"3.4 Submission of Information. . . . The County agrees to reciprocate [BP provision of notice on travel routes and plans] and provide notice to BP ... |
9859 |
Demonstrate reasonableness of Well Pad expansion |
"2.5 Expansion of Existing Well Pads: The reasonableness of the expansion [of existing well pads] under the circumstances shall be demonstrated by ... |
9844 |
Density of well pads |
"2.1 Density. BP agrees that, except as provided in Article 2.2 herein or as may be otherwise permitted in the COGCC order approving BP's Infill ... |
9849 |
Density rule limitation shall not apply when County denies a permit application |
""2.2 Well Location; Exceptions. . . . The limitation [on well pad density] contained in Section 2.1 shall not apply in any instance in which the ... |
9845 |
Drill future wells on existing well pads |
"2.2 Well Location; Exceptions. The County believes that the potential impacts attendant to future gas development would be best mitigated for the ... |
9879 |
Electric motors for artificial lift installations more than 1320 of distribution |
"4.1 Electrification . . . BP agrees that if distribution voltage is not currently within 1320 feet of the proposed Well Pad, it will contact and ... |
9878 |
Electric motors for artificial lift installations within 1320 feet of distribution |
"4.1 Electrification. BP agrees that with respect to Infill Wells within the Infill Application Area requiring long-term artificial lift, it shall ... |
9884 |
Emission control equipment |
"4.3 Emission Control Equipment. BP will comply with existing EPA rules and any future regulations validly adopted by an authority with appropriate ... |