11381 |
Action plan if methane concentration increases |
"5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ... |
11380 |
Action plan if testing reveals thermogenic or intermediate mix |
"5.2 Water Well Monitoring. … If the carbon isotope test results in a thermogenic or intermediate mix signature . . .an action plan shall be ... |
11386 |
Additional post completion water tests |
"5.2 Water Well Monitoring. … Additional 'post completion' test(s) may be required if changes in water quality are identified during follow-up ... |
11379 |
Annual testing if testing reveals thermogenic or intermediate mix |
"5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature, annual testing shall be ... |
11396 |
Applicable federal regulations |
"4. Compliance with all applicable regulations of the BLM, BIA and the Southern Ute Indian Tribe when conducting operations on lands subject such ... |
11338 |
BP waives right to dictate road work |
"3.1 Road Maintenance and Improvement Fees: . . . BP hereby waives its rights, if any, to insist upon completion of the [road] work or to dictate ... |
11332 |
Calculating degree of noncomformity with setback requirements |
"2.4 Legal Non-Conforming Uses and Setbacks: … The increase, if any, in degree of nonconformity shall be the net difference between the two . . . ... |
11784 |
Compliance terms |
"2. Compliance with the terms and provisions of all of the Commission'shealth, safety, welfare and environmental rules and regulations now or ... |
11783 |
Compliance terms |
"1. Compliance with all terms, conditions and provisions of prior Commission Orders in Cause No. 112." |
11358 |
Comply with weight restrictions |
"3.6 Produced Water Hauling. . . .In those instances where the utilization of a water hauling truck is required, BP agrees to strictly comply with ... |
11377 |
Compositional analysis and carbon isotopic analyses |
"5.2 Water Well Monitoring. … If free gas or a methane concentration level greater than 2 mg/L is detected in a water quality testing well, ... |
11388 |
Copies of water test results provided |
"5.2 Water Well Monitoring. … Within three (3) months of collecting the samples used for the test, copies of all test results described above ... |
11336 |
County exercises good faith in performing road work from impact fees |
"3.1 Road Maintenance and Improvement Fees. County and BP have determined that specific land use activities by BP within the Infill Application Area ... |
11350 |
County proves notice to BP |
"3.3 Submission of Information: . . . The County agrees to reciprocate and provide notice to BP of its intended projects and its expected schedule ... |
11349 |
County proves notice to BP |
"3.3 Submission of Information: . . . The first submission of such information, [the forecasted activity], shall occur within thirty (30) days after ... |
11337 |
County shall control road impact work |
"3.1 Road Maintenance and Improvement Fees: . . . The County shall control the sequencing and timing of such [road impact] work" |
11334 |
Demonstrate reasonableness of Well Pad expansion |
"2.5 Expansion of Existing Well Pads: … The reasonableness of the expansion [of existing Well ads] under the circumstances shall be demonstrated by ... |
11328 |
Demonstrating requested need for new facilities |
"2.3 Use of Existing Infrastructure: . . .At the request of the County, BP shall furnish information demonstrating BP's requested need for new ... |
11321 |
Density of well pads |
"2.1 Density. BP agrees that, except as provided in Article 2.2 herein or as may be otherwise permitted in the COGCC order approving BP's Infill ... |
11325 |
Density rule limitation shall not apply when County denies a permit application |
"2.2 Well Location; Exceptions: … The limitation contained in Section 2.1 shall not apply in any instance in which the County denies a permit ... |