9176 Applicability of COGCC Rules "1. Regulations. . . Any exploration or drilling activity conducted by the Company must comply with the revised rules adopted by the COGCC on January ...
11953 BLANK BLANK
6592 Do not refill or service oil-filled electrical equipment with oils containing more than 50 ppm PCBs Electrical equipment, oil-filled: Source Reduction: "If putting back into service, do not refill or service with oils containing more than 50 ppm ...
11179 Electric motors for artificial lift installations within 1320 feet of distribution "4.1 Electrification. Chevron agrees that with respect to Infill Wells drilled after the Effective Date of this Agreement within the Infill ...
4075 Follow BMPs in Habitat Handbook during pipeline burial to prevent wildlife mortalities from entrapment. "Physical and Chemical Hazards - Recommended Mitigations: Follow best management practices from the NMDGF Habitat Handbook Trenching Guideline (13) ...
11398 Infill County Permit for Pad Drilling "2.2 Well Location; Exceptions. ...[I]n situations where reasonable efforts fail to produce a Surface Use Agreement concerning Pad Drilling between ...
7481 Install Compressors to Capture Casinghead Gas If the well produces sufficient casinghead gas, it may be economical to collect this gas for sale, instead of emitting it. One partner reported ...
10386 Lighting Plan "29. Lighting ... Prior to installation of permanent lighting on any facility, the Operator agrees to submit to the Town Manager for review and ...
11175 New roads shall have gravel access "3.6 Use of Equipment. Chevron agrees that . . . b. all new roads associated with the Infill Wells within the Infill Application Area shall have ...
9177 No Double Fines "1. Regulations. . .The City agrees that it will not impose any fine on the Company for violation of a local regulation if the activity or condition ...
5821 Optimizing natural gas production by advancing tubing plunger technology PAAL, LLC is continuing work on optimizing natural gas production by advancing tubing plunger technology
11619 Reasonable installation of additional facilities "2.3 Use of Existing Infrastructure: … Nothing contained in this Article 2.3 shall preclude PETROGULF from installing additional facilities within ...
7477 Reduce Emissions with Dry Seals Dry seal springs press the stationary ring in the seal housing against the rotating ring when the compressor is not rotating. At high rotation ...
8673 Removal of drilling fluids and pit closure after well completion is key to preventing wildlife mortality in reserve pits. "Immediate removal of drilling fluids followed by pit closure after well completion is the key to preventing wildlife mortality in reserve pits."
10984 Road impact fees for Tier 3 facilities "3.2. Road Impact Fees Calculation and Payment. Based upon certain agreed upon assumptions, Chevron and the County have agreed to estimated Road ...
5820 Solutions for foam invasion of gas distribution systems When using foaming agents in natural gas wells, install Foam Control Systems to prevent foam from entering gas distribution systems.
11171 Use of subdivision roads "3.5 Use of Subdivision Roads. Chevron agrees that in those instances where it accesses Infill Wells in the Infill Application Area through a road or ...
7820 Vehicular traffic across dry drainage channels will be limited to sloping side backs or to vertical banks less than two feet high. Surface Water: "Vehicular traffic across dry drainage channels will be limited to sloping side backs or to vertical banks less than two feet high. ...