9176 |
Applicability of COGCC Rules |
"1. Regulations. . . Any exploration or drilling activity conducted by the Company must comply with the revised rules adopted by the COGCC on January ... |
11953 |
BLANK |
BLANK |
6592 |
Do not refill or service oil-filled electrical equipment with oils containing more than 50 ppm PCBs |
Electrical equipment, oil-filled: Source Reduction: "If putting back into service, do not refill or service with oils containing more than 50 ppm ... |
11179 |
Electric motors for artificial lift installations within 1320 feet of distribution |
"4.1 Electrification. Chevron agrees that with respect to Infill Wells drilled after the Effective Date of this Agreement within the Infill ... |
4075 |
Follow BMPs in Habitat Handbook during pipeline burial to prevent wildlife mortalities from entrapment. |
"Physical and Chemical Hazards - Recommended Mitigations: Follow best management practices from the NMDGF Habitat Handbook Trenching Guideline (13) ... |
11398 |
Infill County Permit for Pad Drilling |
"2.2 Well Location; Exceptions. ...[I]n situations where reasonable efforts fail to produce a Surface Use Agreement concerning Pad Drilling between ... |
7481 |
Install Compressors to Capture Casinghead Gas |
If the well produces sufficient casinghead gas, it may be economical to collect this gas for sale, instead of emitting it. One partner reported ... |
10386 |
Lighting Plan |
"29. Lighting ... Prior to installation of permanent lighting on any facility, the Operator agrees to submit to the Town Manager for review and ... |
11175 |
New roads shall have gravel access |
"3.6 Use of Equipment. Chevron agrees that . . . b. all new roads associated with the Infill Wells within the Infill Application Area shall have ... |
9177 |
No Double Fines |
"1. Regulations. . .The City agrees that it will not impose any fine on the Company for violation of a local regulation if the activity or condition ... |
5821 |
Optimizing natural gas production by advancing tubing plunger technology |
PAAL, LLC is continuing work on optimizing natural gas production by advancing tubing plunger technology |
11619 |
Reasonable installation of additional facilities |
"2.3 Use of Existing Infrastructure: … Nothing contained in this Article 2.3 shall preclude PETROGULF from installing additional facilities within ... |
7477 |
Reduce Emissions with Dry Seals |
Dry seal springs press the stationary ring in the seal housing against the rotating ring when the compressor is not rotating. At high rotation ... |
8673 |
Removal of drilling fluids and pit closure after well completion is key to preventing wildlife mortality in reserve pits. |
"Immediate removal of drilling fluids followed by pit closure after well completion is the key to preventing wildlife mortality in reserve pits." |
10984 |
Road impact fees for Tier 3 facilities |
"3.2. Road Impact Fees Calculation and Payment. Based upon certain agreed upon assumptions, Chevron and the County have agreed to estimated Road ... |
5820 |
Solutions for foam invasion of gas distribution systems |
When using foaming agents in natural gas wells, install Foam Control Systems to prevent foam from entering gas distribution systems. |
11171 |
Use of subdivision roads |
"3.5 Use of Subdivision Roads. Chevron agrees that in those instances where it accesses Infill Wells in the Infill Application Area through a road or ... |
7820 |
Vehicular traffic across dry drainage channels will be limited to sloping side backs or to vertical banks less than two feet high. |
Surface Water: "Vehicular traffic across dry drainage channels will be limited to sloping side backs or to vertical banks less than two feet high. ... |
4956 |
WO |