University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 12017
Title: Align pipelines with existing roads
Text: "16. Flow Lines. ... To the maximum extent reasonably practicable, any newly constructed or substantially modified flow lines on site shall meet the following requirements: ... b. Pipelines shall be aligned with established roads in order to minimize surface impacts and reduce disturbance."
Source Publication Name: Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017
Citation Section: Att. A
Citation Page: 17
Supplemental Documents:  
Usage Type: Required
Timing: • Construction / Siting / Design
Oil / Gas Field:  
Surface Ownership: • Federal
• State
• Private
Mineral Ownership: • Federal
• State
• Private
Primary Contact: Margaret Brubaker
City of Brighton
21 North 1st Avenue, Suite 290
Brighton, CO  80601  United States
Phone:     Alt. Phone:
Fax:     E-mail: 
Alternate Contact: Petro Operating Company, LLC
915 West Lehigh Avenue, No. 1394
Englewood, Colorado  80150
Phone:     Alt. Phone:
Fax:     E-mail:rogeraparker9@aol.com
Categories: Land Surface Disturbance
Location: Colorado
Species:
Vegetation Types:
• Suburban / urban
General Comments: Local Government - Operator MOU
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2017-04-24 12:22 UTC
Last Updated: 2017-04-24 18:18 UTC