University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 3383
Title: If circumstances of oil and gas operations are done without impacts to bald eagles, stipulations can be waived.
Text: F-3 TIMING LIMITATION STIPULATION-CRITICAL BALD EAGLE AREAS: "If circumstances or relative resource values change or if it can be demonstrated that oil and gas operations can be conducted without causing unacceptable impacts, this stipulation may be waived, excepted, or modified by the BLM Authorized Officer, if such action is consistent with the provisions of the Farmington Resource Management Plan, or if not consistent, through a land use plan amendment and associated National Environmental Policy Act analysis document. If the BLM Authorized Officer determines that the waiver, exception, or modification involves an issue of major public concern, the waiver, exception, or modification shall be subject to a 30-day public review period. Any changes to this stipulation will be made in accordance with the land use plan and/or the regulatory provisions for such changes."
Source Publication Name: Farmington Resource Management Plan with Record of Decision
Citation Section: APPENDIX A: SPECIES SPECIFIC RECOMMENDATIONS
Citation Page: B-2
Supplemental Documents:  
Usage Type: Required
Timing: • Production / Operation / Maintenance
Oil / Gas Field:  
Surface Ownership: • Federal
Mineral Ownership: • Federal
Primary Contact: BLM - Farmington Field Office
1235 La Plata Highway, Suite A
Farmington, New Mexico  87401  United States
Phone:(505) 599-8900     Alt. Phone:
Fax:     E-mail: 
Alternate Contact:  
 
Categories: Wildlife
Location: New Mexico
Species:
• Eagle, Bald
• Sheep, Bighorn
Vegetation Types:
General Comments:
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2009-03-09 16:47 UTC
Last Updated: 2009-06-24 11:12 UTC