BMP ID: |
4129 |
Title: |
Must have a plan if operations cannot be avoided on slopes 21-40%. |
Text: |
"Fragile Soils/Slopes: Planning Area Wide: If surface-disturbing activities cannot be avoided on slopes 21-40% a plan would be required. The plan would be approved by BLM prior to construction and maintenance and include: an erosion control strategy, GIS modeling, proper survey and design by a certified engineer." |
Source Publication Name: |
Vernal Resource Management Plan Draft Environmental Impact Statement |
Citation Section: |
Appendix K - Surface Stipulations Applicable to all Surface-Disturbing Activities |
Citation Page: |
K-6 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Planning / Environmental Review
|
Oil / Gas Field: |
Uinta Basin (UINTA-PICEANCE) |
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
BLM - Vernal Field Office 170 South 500 East Vernal, Utah 84078 United States |
|
Alternate Contact: |
|
|
Categories: |
Land Surface Disturbance
Soils (Conservation, Pollution, Reclamation)
|
Location: |
Utah |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-03-13 12:28 UTC |
Last Updated: |
2011-02-10 19:56 UTC |