BMP ID Short Title Text of BMP
7234 A BLM approved plan is required on 21-40% slopes where surface disturbing activities cannot be avoided "Fragile Soils/Slopes: Planning Area Wide: If surface disturbing activities cannot be avoided on slopes from 21-40% a plan will be required. The plan ...
7818 A person qualified to identify well-developed soil crusts will be available to monitor activities in areas of such crusts. Soils and Vegetation: "A person qualified to identify well-developed soil crusts will be available to monitor activities in areas of such crusts. ...
2267 Access roads should be practical and avoid erosion. All vehicles will not travel outside of the original access road boundary "e. Surface disturbance minimization. (4) Access roads. Existing roads shall be used to the greatest extent practicable to avoid erosion and minimize ...
2569 Address revegetation methods and soil treatments in reclamation plans Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individual POD facility abandonment via a ...
3825 Address soil conservation during initial phases of disturbance "Soil conservation should be addressed during the initial phase of any surface disturbing action, thereby maintaining soil productivity and stability ...
4680 Adequately protect stockpiled topsoil and replaceit on the surface during reclamation Soils: "Adverse impacts to soils would be mitigated by adequately protecting stockpiled topsoil and replacing it on the surface during reclamation; ...
4676 Adhere to the reclamation guidelines presented in BLM 2004 Soils: "Operators would adhere to the reclamation guidelines presented in BLM 2004."
5068 After grading, seed or apply erosion control to soil. "Final Reclamation: Seed Application: Upon completion of final grading, soil surfaces should either be seeded, or erosion control measures should be ...
2373 After the drilling pit is sufficiently dry, the pit shall be backfilled. "d. Drilling pit closure....(2) Drilling pit closure on non-crop land. All drilling fluids shall be disposed of in accordance with the 900 Series ...
2299 All areas compacted by drilling operations shall be cross-ripped. "c.Compaction alleviation. All areas compacted by drilling and subsequent oil and gas operations which are no longer needed following completion of ...
3889 All companies submitting APDs and PODs for CBNG projects must submit a soil survey for the project area C. Soil Survery Requirements: "All companies submitting APDs and PODs for CBNG projects must submit a soil survey for the project area. One source ...
9551 All disturbed areas to be reseeded by suitable grass (approved by City) "24. Reclamation and Reseeding. c. Re-vegetation. Unless otherwise agreed by the City, all areas disturbed by the Company's activities shall be ...
7830 All oil, diesel, or hydraulic fluid spills will be cleaned up immediately and removed, including any contaminated soils. Waste: "All oil, diesel, or hydraulic fluid spills will be cleaned up immediately and removed, including any contaminated soils. All spill-related ...
1189 All roads must follow Gold Book standards "Soils and Water- Mitigation Measures: Various techniques will be employed to reduce soil erosion. ... Depending upon the site-specific situation, ...
2303 All segregated soil horizons must be replaced to original positions "e. Restoration and revegetation....(1)Revegetation of crop lands. All segregated soil horizons removed from crop lands shall be replaced to their ...
7895 All topsoils will be removed and stockpiled for reuse "All surface soil materials (topsoil) are to be removed from the entire cut and fill area and temporarily stockpiled for reuse during interim and ...
116 Allow new surface-disturbing activities on critical soils Soil and Water Resources: "SW01/PW30 — Allow new surface-disturbing activities on critical soils on about 75,000 acres within level 3 lands only if ...
4065 Amend surfaces for dirt roads that must be placed on soils susceptible to ruts, or on steeper grades. Limit travel when the ground is wet. "Erosion and Water Quality - Recommended Mitigations: Amend surfaces with gravel, sand, stone, cinders, or other available material for dirt roads ...
1271 Apply appropriate erosion control measures "Appropriate erosion control and revegetation measures will be employed. Grading and landscaping will be used to minimize slopes, and water bars will ...
1644 Apply biodegradable mulch, netting, or soil stabilizers Soil, Erosion, and Sediment Control: "Avoid adverse impacts to soils by applying biodegradable mulch, netting, or soil stabilizers."