BMP ID: |
5002 |
Title: |
Apply temporary erosion and sediment control measures. |
Text: |
"Surface Runoff and Erosion Control: Drill Site, Access Road, and Pipeline Right-of-Way: Temporary Reclamation: To minimize sedimentation of drainage channels and wetlands during the interim period between construction activity and final reclamation, temporary erosion and sediment control measures should be applied." |
Source Publication Name: |
Record of Decision Desolation Flats Natural Gas Field Development Project |
Citation Section: |
Appendix C: Reclamation Recommendations |
Citation Page: |
C-6 |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Production / Operation / Maintenance
• Reclamation
|
Oil / Gas Field: |
Desolation Flats Natural Gas Field (GREATER GREEN RIVER) |
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
BLM - Wyoming State Office 5353 Yellowstone Road Cheyenne, Wyoming 82003 United States |
Phone: | (307) 775-6256 |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
|
|
Categories: |
Land Surface Disturbance
|
Location: |
Wyoming |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-04-23 12:32 UTC |
Last Updated: |
2009-04-23 12:32 UTC |