BMP ID: |
6896 |
Title: |
Apply water to road and construction area |
Text: |
"Roads/access/utilities: [] manage[] [dust] during construction by applying water to roads and construction areas when bare soil was present." |
Source Publication Name: |
Reducing Onshore Natural Gas and Oil Exploration and Production Impacts Using a Broad-Based Stakeholder Approach: Adverse Impact Reduction Handbook |
Citation Section: |
3.3.1: Table 3-8. Surface Disturbance Issues and Solutions Utilized in Powder River CBNG Case Study |
Citation Page: |
36 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Construction / Siting / Design
|
Oil / Gas Field: |
POWDER RIVER BASIN |
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
Interstate Oil and Gas Compact Commission PO Box 53127 Oklahoma City, Oklahoma 73152 USa |
|
Alternate Contact: |
ALL Consulting 1718 South Cheyenne Ave. Tulsa, Oklahoma 74119 United States |
Phone: | (918) 382-7582 |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Categories: |
Air Quality and Emissions
|
Location: |
Wyoming |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2010-06-03 15:58 UTC |
Last Updated: |
2011-02-06 12:24 UTC |