BMP ID: |
9521 |
Title: |
Installation of hydrocarbon production at pad sites |
Text: |
"3. Central Hub. . . . However, Encana will still install at the pad sites all other equipment and facilities necessary for the production of hydrocarbons, including wellhead equipment, separation equipment, electrical equipment, and temporary flowback equipment (including temporary storage tanks)." |
Source Publication Name: |
Operator Agreement Between Erie and Encana Oil and Gas, 2015 |
Citation Section: |
Appendix A |
Citation Page: |
A-2 |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Construction / Siting / Design
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
Town of Erie 645 Holbrook Street, P.O. Box 750 Erie, CO 80516 United States |
|
Alternate Contact: |
Jessica Cavens Encana Oil and Gas 370 17th Street, Suite 1700 Denver, CO 80202 USA |
|
Categories: |
Air Quality and Emissions
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
• Suburban / urban
|
General Comments: |
Local Government - Operator MOU |
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2016-01-06 12:46 UTC |
Last Updated: |
2016-03-07 19:27 UTC |