Title: |
Inability to utilize Central Hub |
Text: |
3". Central Hub. . . In addition, this BMP is subject to Article IV, Sections 3 and 4 of the Agreement."
Article IV, Section IV: "Pad Sites Unable to Connect to Hub: Encana intends to utilize the Hub for all Identified Pad Sites. However, Encana may not be able to utilize the Hub for certain of these Pad Sites due to inability to obtain pipeline rights-of-way and/or other matters outside Encana's reasonable control. For any such Pad Sites where Encana is unable to utilize the Hub, Encana may, after conferring with Erie, install hydrocarbon storage tanks and any other facilities necessary for the production of hydrocarbons at those locations. All other provisions of this Agreement shall continue to apply to any such Pad Sites." |
Source Publication Name: |
Operator Agreement Between Erie and Encana Oil and Gas, 2015 |
Citation Section: |
Appendix A |
Citation Page: |
A-2 |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Planning / Environmental Review
• Construction / Siting / Design
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
Town of Erie 645 Holbrook Street, P.O. Box 750 Erie, CO 80516 United States |
|
Alternate Contact: |
Jessica Cavens Encana Oil and Gas 370 17th Street, Suite 1700 Denver, CO 80202 USA |
|
Categories: |
Air Quality and Emissions
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
• Suburban / urban
|
General Comments: |
Local Government - Operator MOU |