University of Colorado at Boulder
BMP of Oil and Gas Development

Browse BMPs

You are viewing BMP records related to the Watershed Plan for the Town of Palisade and the City of Grand Junction Colorado publication.

BMP ID Short Title Text of BMP
6135 Achieve isolation of fresh water zones prior to deepening of the well Well Construction - Cementing/Surface Casing: "If the aforemenioned steps have not been achieved, remedial cement work will be conducted until ...
6079 Add monitoring stations to accommodate specific areas of concern Watershed Plan: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern"
6061 Add monitoring stations to accommodate specific areas of concern Watershed Plan: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern."
6154 Adopt a zero-tolerance drug usage policy Subcontractor Conduct: "Genesis has a zero-tolerance policy regarding drug usage. All subcontractors prior to working in the watersheds will have to ...
6082 Assimilate, compare, and interpret all data collected Watershed Plan: "Assimilate, compare, and provide professional interpretations of all data collected"
6064 Assimilate, compare, and provide professional interpretations of all data collected WATERSHED PLAN: "Assimilate, compare, and provide professional interpretations of all data collected"
6090 Avoid construction and operations within or near sensitive areas Collaborative Plans of Development (POD): Well site design and construction: "As practicable, [avoid] construction and operations within or near ...
6089 Avoid culturally significant, environmentally or ecologically sensitive areas Collaborative Plans of Development (POD): Well site design and construction: "[Utilize] the most level areas, avoiding narrow ridges, steep slopes, ...
6088 Choose well sites in areas with lowest potential impacts Collaborative Plans of Development (POD): Well site design and construction: "[Choose] the location of well sites/development pads in areas with the ...
6063 Collect produced water samples from each well WATERSHED PLAN: "Collect produced water samples from each well within six months of final well completion, and on an annual basis where applicable."
6081 Collect produced water samples within 6 months of well completion Watershed Plan: "Collect produced water samples from each well within six months of final well completion, and on an annual basis where applicable"
6094 Compact all fill slopes to minimize risk of slope failure and sedimentation Collaborative Plans of Development (POD): Well site design and construction: "[Compact] all fill slopes so as to minimize the risk of slope failure ...
6162 Compact pipeline trenches during backfill Pipelines: Planning and Construction: "Compact pipeline trenches during backfill"
6104 Conduct an education program regarding equipment and vehicles in the watersheds Subcontractor Education: "Genesis will also design and conduct an education program for employees, subcontractors, and others as needed regarding the ...
6106 Conduct an information/education program for subcontractor employees Emergency Response Plan: "Devise and conduct, as frequently as is necessary, an information and education program for all subcontractor employees ...
6073 Conduct field reconnaissance and mapping for conceptual flow model development Hydrological Studies: Baseline: Hydrologic program elements will include: "Conduct hydrological field reconnaissance and mapping that will contribute ...
6074 Conduct hydrochemistry studies to support watershed characterization Hydrological Studies: Baseline: Hydrologic program elements will include: "Conduct special hydrochemistry studies (e.g. isotope sampling) to support ...
5993 Conduct hydrological field reconnaissance and mapping that will contribute to conceptual flow model development Hydrological Studies: Baseline: "Conduct hydrological field reconnaissance and mapping that will contribute to conceptual flow model development ...
6143 Conduct remedial cement work if determined that coverage/zonial isolation was not achieved Well Construction - Cementing/Production Casing: "Conduct remedial cement work if the cement bond log and temperature survey determines cement ...
6140 Conduct remedial cement work to lift cement above bottom of surface casing Well Construction - Cementing/Intermediate Casing String: "If the cement has not been lifted to above the bottom of the surface casing as specified, ...
Page:<< Previous|123456|Next >>   Goto to page: