You are viewing BMP records related to the Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 publication.

BMP ID Short Title Text of BMP
11995 Align access roads with existing grades "11. Visual Impacts and Aesthetics. ... To the maximum extent reasonably practicable, Operator shall comply with the following aesthetic provisions: ...
12017 Align pipelines with existing roads "16. Flow Lines. ... To the maximum extent reasonably practicable, any newly constructed or substantially modified flow lines on site shall meet the ...
12011 Avoid dust suppression near high water marks of waterbodies "14. Fugitive Dust Suppression. ... Operator will avoid dust suppression activities within three hundred (300) feet of the high water mark of any ...
11970 Berm requirements for secondary containment "2. Containment berms. Operator shall utilize steel-rim berms as secondary containment around tanks and separators at well sites with sufficient ...
11938 Bury temporary water lines or use existing culverts "8. Water Supply and Quality. ... If necessary, Operator will bury temporary water lines at existing driveway and gravel road crossings, or utilize ...
11990 Chemicals and flowback can remain on-site during drilling operations "8. Chemical Storage. ... hydraulic fracturing chemicals and flowback from hydraulic fracturing on multi-well pads may remain on location or at ...
11989 Chemicals and wastewater removal within 30 days of fracturing completion "8. Chemical Storage. Operator shall remove hydraulic fracturing chemicals and flowback from hydraulic fracturing, from the Well Sites within 30 days ...
11934 City and operator meetings "7. Meetings to Monitor and Discuss MOU Issues. The City and Operator agree to meet as necessary and reasonable, to monitor and discuss any pertinent ...
12020 Clear construction debris after operation has ended "18. Removal of Debris and Excess Materials and Equipment. When each oil and gas operation is completed, all construction-related waste debris ...
12013 Clear operational grounds of flammable material "15. Flammable Material. All ground within twenty five (25) feet of any tank, or other structure containing flammable or combustible materials shall ...
11977 Closed loop drilling system "3. Water Supply and Quality. ... A closed loop drilling fluid system will be used during the drilling process to recycle fluids"
11973 Construction materials of secondary containment "2. Containment berms. ... a. Secondary containment for tanks shall be constructed with a synthetic or engineered liner that contains all primary ...
11994 Consult city before clearing trees "11. Visual Impacts and Aesthetics. ... To the maximum extent reasonably practicable, Operator shall comply with the following aesthetic provisions: ...
12008 Contain silica dust "14. Fugitive Dust Suppression. Silica dust must be contained to the maximum extent reasonably practicable during the hydraulic fracturing process."
11996 Coordinate landscaping with surface developers "11. Visual Impacts and Aesthetics. ... To the maximum extent reasonably practicable, Operator shall comply with the following aesthetic provisions: ...
11942 Copies of water test results provided "9. Water Quality Monitoring Plan. ... c. Copies of all water test results shall be provided to the City and landowner within thirty (30) days of ...
11957 dB(C) noise regulation "11. Noise Mitigation Measures. ... For db(C) scale noise, Operator shall comply with the requirements of COGCC Regulation 802 as amended from time ...
12022 Do not bury or burn waste on site "18. Removal of Debris and Excess Materials and Equipment. ... Materials and/or waste shall not be buried or burned on-site."
12005 Do not open thief hatch during tank unload "13. Air Quality Mitigations. a. In addition to the requirements under Colorado Air Quality Control Program, Title 25, Section 7, C.R.S., oil and gas ...
12010 Do not use untreated wastewater as dust suppressant "14. Fugitive Dust Suppression. ... No untreated or unrecycled produced water or other process fluids shall be used for dust suppression."