BMP ID: |
1312 |
Title: |
Place pipeline crossings beneath all alluvial material |
Text: |
"...an analysis of channel degradation and scour should be completed to ensure the lines are not exposed and broken during extreme runoff events. Without such an analysis, pipeline crossings should be excavated to bedrock and placed beneath all alluvial material." |
Source Publication Name: |
Vernal Resource Management Plan Draft Environmental Impact Statement |
Citation Section: |
Appendix B: Hydraulic Considerations for Pipelines Crossing Stream Channels |
Citation Page: |
B-3 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Planning / Environmental Review
• Production / Operation / Maintenance
|
Oil / Gas Field: |
Uinta Basin (UINTA-PICEANCE) |
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
BLM - Vernal Field Office 170 South 500 East Vernal, Utah 84078 United States |
|
Alternate Contact: |
|
|
Categories: |
Water Quality and Pollution
Land Surface Disturbance
Aquatic and Riparian Values
|
Location: |
Utah |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-02-04 13:40 UTC |
Last Updated: |
2011-06-07 16:17 UTC |