BMP ID: |
1314 |
Title: |
Construct pipeline crossings above highest terrace |
Text: |
"Pipeline crossings should be constructed to elevate the pipeline above the level of the highest and outermost terrace at the crossing. This level represents the geomorphic surface likely to be associated with the maximum probable flood." |
Source Publication Name: |
Vernal Resource Management Plan Draft Environmental Impact Statement |
Citation Section: |
Appendix B: Hydraulic Considerations for Pipelines Crossing Stream Channels |
Citation Page: |
B-3 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Production / Operation / Maintenance
|
Oil / Gas Field: |
Uinta Basin (UINTA-PICEANCE) |
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
BLM - Vernal Field Office 170 South 500 East Vernal, Utah 84078 United States |
|
Alternate Contact: |
|
|
Categories: |
Aquatic and Riparian Values
Water Quality and Pollution
Water Quantity and Rights
|
Location: |
Utah |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-02-04 13:40 UTC |
Last Updated: |
2009-02-04 13:40 UTC |