BMP ID: |
2330 |
Title: |
When pipelines cross crop lands, the operator must segregate topsoil and trenches must be backfilled. |
Text: |
"d. Excavation, backfill and reclamation. (1) When pipelines cross crop lands, unless waived by the surface owner, the operator shall segregate topsoil while trenching, and trenches shall be backfilled so that the soils shall be returned to their original relative positions and contour. This requirement to segregate and backfill topsoil shall not apply to trenches which are twelve (12) inches or less in width. Reasonable efforts shall be made to run pipelines parallel to crop irrigation rows on flood irrigated land." |
Source Publication Name: |
Recommendations for Development of Oil and Gas Resources within Crucial and Important Wildlife Habitats |
Citation Section: |
1101. INSTALLATION AND RECLAMATION |
Citation Page: |
1101(d)(1) |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Reclamation
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
Colorado Oil and Gas Conservation Commission Main Office 1120 Lincoln Street, Suite 801 Denver, Colorado 80203 United States |
Phone: | (303) 894-2100 |
|
Alt. Phone: | (303) 888-1101 |
Fax: | (303) 894-2109 |
|
E-mail: | |
|
Alternate Contact: |
|
|
Categories: |
Grazing and Agriculture
Community
Land Surface Disturbance
Soils (Conservation, Pollution, Reclamation)
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-02-17 10:01 UTC |
Last Updated: |
2011-02-20 20:03 UTC |