BMP ID: |
2537 |
Title: |
Prior to surface disturbances, reclamation plans must be approved by Authorized Officer. |
Text: |
"Performance Objectives: 3. Prior to surface disturbance on slopes of, or greater than, 40 percent, an engineering/reclamation plan must be approved by the Authorized Officer. Such plans must demonstrate how the following will be accomplished: [Stip. Code: CO-27]
a. Site productivity will be restored.
b. Surface runoff will be adequately controlled.
c. Off-site areas will be protected from accelerated erosion such as drilling, gullying, piping,
and mass wasting.
d. Surface-disturbing activities will not be conducted during extended wet periods.
e. Construction will not be allowed when soils are frozen." |
Source Publication Name: |
Best Management Practices for Grasslands, Sagebrush, and Riparian Habitat |
Citation Section: |
APPENDIX 1: Leasing Stipulations Craig-Little Snake BLM |
Citation Page: |
A1-8 |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Production / Operation / Maintenance
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
Lauren McKeever Bureau of Land Management 1625 West Pine St. P.O. Box 768 Pinedale , Wyoming 82941 United States |
|
Alternate Contact: |
|
|
Categories: |
Soils (Conservation, Pollution, Reclamation)
Land Surface Disturbance
|
Location: |
Wyoming |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-02-26 15:04 UTC |
Last Updated: |
2011-02-16 15:18 UTC |