University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 2549
Title: Minimize emissions of particulate matter from well pad and road construction
Text: "During construction, emissions of particulate matter from well pad and resource road construction will be minimized by application of water, or other dust suppressants, with at least 50 percent control efficiency. Roads and well locations constructed on soils susceptible to wind erosion could be appropriately surfaced or otherwise stabilized to reduce the amount of fugitive dust generated by traffic or other activities, and dust inhibitors (surfacing materials, non-saline dust suppressants, and water) could be used as necessary on unpaved collector, local and resource roads that present a fugitive dust problem. The use of chemical dust suppressants on BLM surface will require prior approval form the BLM authorized officer."
Source Publication Name: Record of Decision and Resource Management Plan Amendments for the Powder River Basin Oil and Gas Project
Citation Section: Appendix A, Section A.2: Mitigation Measures
Citation Page: A-18
Supplemental Documents: Fugitive Dust Mitigation Measures, Effectiveness and Cost
Usage Type: Required
Timing: • Construction / Siting / Design
Oil / Gas Field: POWDER RIVER BASIN
Surface Ownership: • Federal
Mineral Ownership: • Federal
Primary Contact: BLM - Buffalo Field Office
1425 Fort St.
Buffalo, Wyoming  82834  United States
Phone:(307) 684-1100     Alt. Phone:
Fax:     E-mail: 
Alternate Contact:  
 
Categories: Air Quality and Emissions
Location: Wyoming
Species:
Vegetation Types:
General Comments:
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2009-02-27 11:52 UTC
Last Updated: 2010-02-26 13:49 UTC