University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 4938
Title: All facilities that potentially leak or spill should be placed within containment or diversionary structures
Text: "Fluid Minerals: 15) All production facilities installed on location that have the potential to leak or spill oil, glycol, produced water, or other fluid, shall be placed within an appropriate containment or diversionary stucture" [Reduce impacts from fluid mineral construction, operation, and reclamation]
Source Publication Name: Atlantic Rim Natural Gas Field Final Environmental Impact Statement
Citation Section: Appendix H: Required Best Management Practices
Citation Page: H-4
Supplemental Documents:  
Usage Type: Required
Timing: • Production / Operation / Maintenance
Oil / Gas Field: Atlantic Rim Natural Gas Field (GREATER GREEN RIVER)
Surface Ownership: • Federal
Mineral Ownership: • Federal
Primary Contact: David Simons
BLM - Wyoming State Office
5353 Yellowstone Road
Cheyenne, Wyoming  82003  United States
Phone:(307) 328-4328     Alt. Phone:
Fax:     E-mail: 
Alternate Contact:  
 
Categories: Water Quality and Pollution
Land Surface Disturbance
Human Health and Safety
Location: Wyoming
Species:
Vegetation Types:
General Comments:
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2009-04-17 13:28 UTC
Last Updated: 2009-07-16 19:58 UTC