BMP ID: |
6339 |
Title: |
All blooie lines must end a minimum of 30' from the wellbore and be securely anchored. The blooie lines must be in a straight line. |
Text: |
Drilling and Production Related Field Considerations: "All blooie lines must end a minimum of 30' from the wellbore and be securely anchored. The blooie lines must be in a straight line." |
Source Publication Name: |
Coal Bed Natural Gas APD and Project POD Guidance Manual |
Citation Section: |
Section VII |
Citation Page: |
13 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Construction / Siting / Design
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
BLM - Miles City Field Office 111 Garryowen Road Miles City, Montana 59301 United States |
|
Alternate Contact: |
|
|
Categories: |
Human Health and Safety
|
Location: |
Montana |
Species: |
|
Vegetation Types: |
|
General Comments: |
Blooie Line - The discharge pipe in an air drilling operation that conducts away from the rig the air or gas being used for circulation. |
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2010-02-01 14:20 UTC |
Last Updated: |
2010-02-21 12:29 UTC |