BMP ID: |
6808 |
Title: |
Construct well site and drill from August 1 through April 30 |
Text: |
"Preferred Alternative: Construction and drilling activities will be conducted from August 1 through April 30 in order to avoid conflicts with wildlife and limit ground disturbance activities to periods of low precipitation to minimize impacts to soil." |
Source Publication Name: |
Final Environmental Assessment of Planned Gas and Oil Exploration, Baca National Wildlife Refuge, Saguache County, Colorado |
Citation Section: |
2.0 Description of Alternatives; 2.2 Preferred Alternatives |
Citation Page: |
2-2 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Construction / Siting / Design
• Drilling
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Private
|
Primary Contact: |
U.S. Fish & Wildlife Service -Alamosa, Colorado 9383 El Rancho Lane Alamosa, Colorado 81101-9003 |
Phone: | (719) 589-4021 |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
Lexam Exploration 99 George St. 3rd Floor Toronto, Ontario M5A 2N4 Canada |
Phone: | (866) 441-0690 |
|
Alt. Phone: | |
Fax: | (647) 258-0408 |
|
E-mail: | |
|
Categories: |
Land Surface Disturbance
Soils (Conservation, Pollution, Reclamation)
Wildlife
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2010-05-27 09:40 UTC |
Last Updated: |
2011-02-06 16:32 UTC |