BMP ID: |
9438 |
Title: |
Align Pipelines with Established Roads |
Text: |
"34. Pipelines. Any newly constructed or substantially modified pipelines on site shall meet the following requirements: . . (b) To the maximum extent feasible, pipelines shall be aligned with established roads in
order to minimize surface impacts and reduce habitat fragmentation and disturbance." |
Source Publication Name: |
Oil and Gas Operator Agreement Between the City of Fort Collins and Prospect Energy, LLC, 2013 |
Citation Section: |
Appendix A |
Citation Page: |
19 |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Construction / Siting / Design
|
Oil / Gas Field: |
Fort Collins Field |
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
City of Fort Collins, Colorado |
Phone: | |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
Prospect Energy, LLC 1600 Stout Street, Suite 1710 Denver, Colorado 80202 |
Phone: | |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Categories: |
Wildlife
Land Surface Disturbance
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
• Suburban / urban
|
General Comments: |
Local Government - Operator MOU |
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2016-01-05 13:14 UTC |
Last Updated: |
2016-03-08 18:12 UTC |