You are viewing BMP records related to the Pinedale Anticline Project Area Final Supplemental Environmental Impact Statement, Appendix 4:BLM publication.

BMP ID Short Title Text of BMP
2252 Compressor stations near leks. "To avoid potentially significant noise impacts, compressor engines would be located 2,500 feet or more from a dwelling or residence and from ...
172 Coordinate any disturbances to wetlands and/or waters of the U.S with COE "Any disturbances to wetlands and/or waters of the U.S. would be coordinated with the COE [Army Corps of Engineers], and 404 permits would be secured ...
2249 Monitoring lekss "Monitoring would be required by BLM to determine which leks in the PAPA are occupied and which have been abandoned."
2247 No permanent high profile structures near lek "Permanent (life of the project), high profile structures such as buildings and storage tanks would not be constructed within 0.25 mile of an ...
2246 No surface disturbance near lek "Surface disturbance within 0.25 mile of an occupied greater sage-grouse lek would be avoided. Linear disturbances such as pipelines, seismic ...
168 No surface disturbance, permanent facilities, etc. near surface waters, riparian areas, wetlands and 100 year floodplains "All surface disturbance, permanent facilities, etc., would remain a minimum of 500 feet away from the edge of surface waters, riparian areas, ...
2248 Noise limitations "In selecting a site for a compressor facility, a well pad or other permanent facility, the distance from the edge of an occupied greater ...
2251 Noise limitations "Operators would be required to apply noise mitigation at well locations, as determined necessary by the BLM Authorized Officer, on a case-by-case ...
174 Obtain section 404 permits would be obtained where disturbance of wetlands, riparian areas, streams "Where disturbance of wetlands, riparian areas, streams, and ephemeral/intermittent stream channels cannot be avoided, COE Section 404 permits would ...
173 Operators evaluate all project facility sites for occurrence of waters of the U.S. "Operators would evaluate all project facility sites for occurrence of waters of the U.S., special aquatic sites, and wetlands, per COE [Army Corps ...
171 Recontour disturbed wetland areas and use approved species for reclamation "Areas would be recontoured and BLM-approved species would be used for reclamation. Reclamation activities would begin on disturbed wetland areas ...
169 Reshape disturbed channel beds to their approximate original configuration "Disturbed channel beds would be reshaped to their approximate original configuration."
167 Restore streams, wetlands and riparian areas to as near pre-project conditions as practical "Streams, wetlands, and riparian areas disturbed during project construction would be restored to as near pre-project conditions as practical, and if ...
170 Selectively handle wetland topsoil "Wetland topsoil would be selectively handled."
2250 Survey requirements preceding surface disturbing activity "If existing information is not current, field evaluations for greater sage-grouse leks and/or nests would be conducted by a qualified biologist ...