9561 |
Amount of Financial Assurance for road repairs |
"14. Road repairs (b) Encana shall maintain Financial Assurance to secure its road repair obligations under this Agreement. The amount of such ... |
9522 |
Audio, visual, and olfactory leak inspections |
"4. Well leak detection and repair (a) To identify leaks, Encana will perform audio, visual and olfactory inspections on a monthly basis at all ... |
9519 |
Central Hub for Hydrocarbon Storage |
"3. Central Hub. In an effort to reduce air emissions, Encana intends to construct a central gathering and storage facility at a location in ... |
9534 |
Closed-loop systems |
"7. Closed-loop systems. Encana shall use closed-loop systems for drilling and completion operations." |
9518 |
Compliance with COGCC Noise Regulation 802 |
"2. Noise mitigation . . . (b) For db(C) scale noise, Encana shall comply with the requirements of COGCC Regulation 802. as such requirements may be ... |
9531 |
Contact information in mailed notice |
"5. Contact information. Encana shall include its contact information on . . . the mailed notice required by Article III, Section 8 . . . .This ... |
9532 |
Contact information on posted notice |
"5. Contact information. Encana shall include its contact information on . . . the posted notice required by Article III, Section 9. This information ... |
9527 |
Decrease in leak inspection frequency |
"4. Well leak detection and repair (a) . . . . After a well has produced for twelve (12) months, the frequency of such inspections shall decrease ... |
9560 |
Determine extent of road damage |
"14. Road Repairs (a) . . . Encana and Erie will use [road impact] studies to determine the extent of any damage accruing to the road during the ... |
9511 |
Distance to Erie Building Units |
"1. Distance to Erie Building Units. For the Identified Well Pads, the minimum distance between a well or surface equipment, and the nearest exterior ... |
9564 |
Fencing |
"16. Fencing. Oil and gas well facilities (above ground) within the Erie Town Limits shall be fenced as specified by the then current requirements of ... |
9562 |
Form and Duration of Financial Assurance for road repairs |
"14. Financial Assurance . . . . (b) Encana shall maintain Financial Assurance to secure its road repair obligations under this Agreement. . . . ... |
9563 |
Improvement of access roads |
"15. Access roads. Access roads to well and production facilities that connect to a street within Erie shall be improved from the point of connection ... |
9524 |
Inability to utilize Central Hub |
3". Central Hub. . . In addition, this BMP is subject to Article IV, Sections 3 and 4 of the Agreement."Article IV, Section IV: "Pad Sites Unable ... |
9566 |
Inform suppliers that products containing diesel fuel, benzene, or heavy metals cannot be used |
"18. Hydraulic Fracturing Responsible Products Program. Encana has developed and implemented a company-wide Responsible Products Program to manage ... |
9525 |
Infrared leak inspection |
"4. Well leak detection and repair (a) To identify leaks . . . . Encana will also inspect each such well with an infra-red camera on a monthly ... |
9526 |
Initial baseline inspection term |
"4. Well leak detection and repair (a) . . . . The initial baseline inspections will occur within sixty (60) calendar days after the Effective ... |
9521 |
Installation of hydrocarbon production at pad sites |
"3. Central Hub. . . . However, Encana will still install at the pad sites all other equipment and facilities necessary for the production of ... |
9535 |
Light pollution mitigation |
"8. Lighting. Encana will install down cast lighting or some other form of lighting that mitigates light pollution and spill-over onto adjacent ... |
9536 |
No Class II underground injection control wells |
"9. Class II underground injection control wells. Encana shall not develop any new Class II underground injection control wells within the Operator ... |